Lably
Skip to content

Manufacturing resource planning

Corporate planning method

  • 6 min read
  • 4 chapters

Related on Lably

Through Manufacturing, Software and Database

This is not exclusively a software function, but the management of people skills, requiring a dedication to database accuracy, and sufficient computer resources. It is a total company management concept for using human and company resources more productively.

Key functions and features

MRP II is not a single specific proprietary software system and can thus take many forms. It is almost impossible to visualize an MRP II system that does not use a computer. An MRP II system can be based on either purchased–licensed or in-house software.

Almost every MRP II system is modular in construction. Characteristic basic modules in an MRP II system are:

  • Master production schedule (MPS)
  • Item master data (technical data)
  • Bill of materials (BOM) (technical data)
  • Production resources data (manufacturing technical data)
  • Inventories and orders (inventory control)
  • Purchasing management
  • Material requirements planning (MRP)
  • Shop floor control (SFC)
  • Capacity planning or capacity requirements planning (CRP)
  • Standard costing (cost control) and frequently also Actual or FIFO costing, and Weighted Average costing.
  • Cost reporting / management (cost control)

together with auxiliary systems such as:

  • Business planning
  • Lot traceability
  • Contract management
  • Tool management
  • Engineering change control
  • Configuration management
  • Shop floor data collection
  • Sales analysis and forecasting
  • Finite capacity scheduling (FCS)

and related systems such as:

The MRP II system integrates these modules together so that they use common data and freely exchange information, in a model of how a manufacturing enterprise should and can operate. The MRP II approach is therefore very different from the "point solution" approach, where individual systems are deployed to help a company plan, control or manage a specific activity. MRP II is by definition fully integrated or at least fully interfaced.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Computing and communication