Original concept

Medupi was conceived as Project Alpha in 2007, with only three units planned to total 2,292 MW and estimated cost of R32 billion. The design was changed at a late stage in 2007 and doubled in size to 4,584 MW.

The boilers were envisaged to be supercritical in type, which would make them 38% more effective than other Eskom power stations. A dry cooled system was also intended to use less water than other coal-fired power stations in the fleet.

Initial project costing was estimated at R69 billion but that was updated to approximately R80 billion by 2007.

Parsons Brinckerhoff was appointed as the project engineer to oversee all construction.