South African energy crisis

Widespread national level rolling blackouts

  • 21 min read
  • 8 chapters

Related on Lably

Through Power outage, Energy crisis and Coal

According to Eskom and government officials, the solution requires the construction of additional power stations and generators. However, corruption and mismanagement of Eskom, most notably during the Jacob Zuma administration, has exacerbated the energy crisis; while neglect by Eskom staff, multiple acts of sabotage, and the activity of criminal syndicates within Eskom with alleged political connections have also contributed to ongoing power supply problems. Many South African commentators have described the ongoing energy crisis as a symptom of long-standing poor governance.

In April 2024, South Africa had a full month without rotational power cuts, which was the first time since January 2022. However, load shedding and scheduled rolling blackouts returned at the end of January 2025.

South Africa has not had load shedding since May 16, 2025.

Background

In a December 1998 report, analysts and leaders in Eskom and in the South African government predicted that Eskom would run out of electrical power reserves by 2007 unless action was taken to prevent it. To improve power supply and reliability, the 1998 report recommended restructuring Eskom into separate electricity generation and power transmission businesses. Despite the warnings of the 1998 report and requests by Eskom to be allowed to increase capacity, the national government took no action. At the time the Mbeki government was considering the privatisation of Eskom which was cited as a reason why the government took no action. This resulted in Eskom being unable to add additional generating capacity and thereby keep up with increasing national demand for electricity from 2002 onward. The government only granted Eskom permission to significantly expand energy production (by 70%) in 2004.

Aging infrastructure

Fifteen power stations were commissioned between 1961 and 1996, adding a combined 35,804 MW of capacity. In the 21st century, only 9,564 MW of capacity has been added from the currently constructing power stations Medupi and Kusile. Many Eskom power stations are almost 50 years old and near decommissioning. Following the first period of load shedding in 2007 to 2008 Eskom commissioned the construction of the Medupi and Kusile coal fired power plants to expand energy production by 25%. The construction of these plants encountered numerous technical problems and cost overruns whilst the existing fleet of power plants were not replaced and continued to operate past their operational lifespan.

Power station commission history

Below is a timeline of Eskom-built, major power stations