National Highways Development Project
Project to upgrade major highways in India
- 4 min read
- 3 chapters
Related on Lably
Through Government of India, Golden Quadrilateral and Delhi
Project phases
The project is composed of the following phases:
- Phase I: The Golden Quadrilateral (GQ; 5,846 km) connecting the four major cities of Delhi, Mumbai, Chennai and Kolkata. This project, connecting four metro cities, is 5,846 km (3,633 mi). Total cost of the project is Rs.300 billion (US$6.8 billion), funded largely by the government’s special petroleum product tax revenues and government borrowing. In January 2012, India announced the four-lane GQ highway network as complete.
- Phase II: North-South and East-West corridors comprising national highways connecting four extreme points of the country. The North–South and East–West Corridor (NS-EW; 7,142 km) connecting Srinagar in the north to Kanyakumari in the south, including spur from Salem to Kanyakumari (Via Coimbatore and Kochi) and Silchar in the east to Porbandar in the west. Total length of the network is 7,142 km (4,438 mi). As of 31 October 2016, 90.99% of the project had been completed, 5.47% of the project work is under Implementation and 3.52% of the total length is left. It also includes Port connectivity and other projects — 435 km (270 mi). The final completion date to 28 February 2009 at a cost of Rs.350 billion (US$8 billion), with funding similar to Phase I.
- Phase III: The government on 12 April 2007 approved NHDP-III to upgrade 12,109 km (7,524 mi)of national highways on a Build, Operate and Transfer (BOT) basis, which takes into account high-density traffic, connectivity of state capitals via NHDP Phase I and II, and connectivity to centres of economic importance.
- Phase IV: The government on 18 June 2008 approved widening 20,000 km (12,000 mi) of highway that were not part of Phase I, II, or III. Phase IV will convert existing single-lane highways into two lanes with paved shoulders.
- Phase V: As road traffic increases over time, a number of four-lane highways will need to be upgraded/expanded to six lanes. On 5 October 2006 the government approved for upgrade of about 5,000 km (3,100 mi) of four-lane roads.
- Phase VI: The government is working on constructing 1,000 km (620 mi) expressways that would connect major commercial and industrial townships. It has already identified 400 km (250 mi) of Vadodara (earlier Baroda)-Mumbai section that would connect to the existing Vadodara (earlier Baroda)-Ahmedabad section. The World Bank is studying this project. The project will be funded on BOT basis. The 334 km (208 mi) Expressway between Chennai—Bangalore and 277 km (172 mi) Expressway between Kolkata—Dhanbad has been identified and feasibility study and DPR contract has been awarded by NHAI.
- Phase VII: This phase calls for improvements to city road networks by adding ring roads to enable easier connectivity with national highways to important cities. In addition, improvements will be made to stretches of national highways that require additional flyovers and bypasses given population and housing growth along the highways and increasing traffic. The government has planned to invest Rs. 16,680 Cr for this phase. The 19 km (12 mi) long Chennai Port—Maduravoyal Elevated Expressway is being executed under this phase.
Note: 1 crore= 10 million
"Financing of the National Highway Development Programme" (PDF). Archived from the original (PDF) on 28 February 2007.
Sign in to keep reading
2 more chapters are free with a Lably account.
Status from NHAI website
National Highways Development Project is being implemented in all phases. The present phases are improving more than 49,260 km of arterial routes of NH network to international standards. The project-wise details of NHDP all phases is below as of 18 May 2021:
Subsummation in Bharatmala project
National Highway Development Project will close by first half of 2018, with the launch of Bharatmala project. 10,000 km of highway construction left under NHDP will be merged with Phase I of the Bharatmala. Following the launch of Bharatmala Pariyojana in 2017, the remaining works under the NHDP were subsumed into Bharatmala Phase I. Concurrently, the government of India launched complementary infrastructure programmes such as Sagarmala for port led development and Setu Bharatam for the construction of road over bridges and under passes on National Highways.