Lably
Skip to content

Expressways of India

  • 11 min read
  • 8 chapters

Related on Lably

Through Pune, Delhi and Indian subcontinent

A central reservation or median separates the traffic moving in opposite directions on expressways. Entry and exits are permitted only through grade separated interchanges. In contrast, National highways may or may not have a median and may lack full access-control. Additionally, some highways constructed by State Governments, which may be fully or partially access-controlled, are designated or named as expressways by the respective State authorities.

Fully opened in April 2002, Mumbai–Pune Expressway was India's first six-lane, access-controlled, inter-city tolled expressway. Spanning 94.5 km (58.7 mi) between Mumbai and Pune, within the state of Maharashtra, it set the benchmark for future expressway development in the country. Since then, expressway construction has significantly accelerated, particularly under the Bharatmala project and other infrastructure programmes both national and regional.

As of 2024, the longest expressway in India is the partially-opened Delhi–Mumbai Expressway (Phase-3), spanning 1,015 km (631 mi), which was inaugurated on 18 December 2024. The widest expressway is the Delhi–Gurgaon section of the Dwarka Expressway, featuring 16 lanes, which was also opened in 2024.

History

Pre-independence

While major roads in the Indian subcontinent existed as early as the 29th century BCE in the Indus Valley, the 3,655 km (2,271 mi) long Grand Trunk Road built by the Mauryans during 4th century BCE and later maintained by others, is one of the earliest examples of highest class road infrastructure in India. In 1934, Indian Roads Congress (IRC) was formed to overlook development and research of roads in India and envisioned to achieve a road density of 16 km per 100 km2 of land pre-independence. IRC would later go on to standardise access-controlled Expressway designs for India with its IRC:SP:99-2013 standard. It was not until in 1995 when National Highways Authority of India (NHAI) was established as an autonomous body to develop, maintain and manage India's road network through National Highways. NHAI would later build and operate various expressways in the country.

In 1990, Government of Maharashtra appointed RITES to conduct a feasibility study for toll-based expressway between Mumbai and Pune, marking it as the first such initiative to construct an expressway in India. Four years later, RITES submitted its report and the project was estimated to cost ₹1,146 crore (equivalent to ₹82 billion or US$850 million in 2026). In March 1997, Maharashtra State Road Development Corporation (MSRDC) undertook the construction of the expressway on a Build–operate–transfer (BOT) model that allowed the state government to collect tolls for 30 years. At the end of the same year, after all environmental and forest clearances, the construction on the 94.5 km (58.7 mi) corridor commenced with first sections opening in 2000. In April 2002, India's first expressway was flagged to be fully operational, with an estimated construction cost of ₹1,630 crore (equivalent to ₹68 billion or US$700 million in 2026), which paved the way for more such expressways across the country.

On 24 January 2001, the eight-lane 7.5 km (4.7 mi) long DND Flyway between Delhi and Noida was operationalised, becoming the first urban expressway in India. Following Mumbai-Pune, Ahmedabad–Vadodara Expressway was then opened between the cities of Ahmedabad and Vadodara in Gujarat on 16 August 2004. While this expressway was operationalised two years later, it was designated as National Expressway 1 (NE-1) back in 1986 by the Government of India.

In 2009, with the advent of new expressway infrastructures coming up across India, the Ministry of Road Transport and Highways (MoRTH) was preparing to set-up National Expressways Authority of India (NEAI) to be in-charge of the construction and maintenance of expressways, however, the Ministry did not proceed with the creation of NEAI for unspecified reasons and NHAI continued to remain in-charge.

Bharatmala pariyojana

Prior to being subsumed under Bharatmala Pariyojana (lit. 'India garland project'), the government of India had launched National Highways Development Project (NHDP) in 1998 as a seven-step flagship project to construct highest class roads in India and to upgrade the existing ones. The phase-4 of which included the development of 1,000 km (620 mi) of expressways at an indicative cost of ₹15,000 crore (equivalent to ₹740 billion or US$7.7 billion in 2026). In 2017, under Bharatmala about 1,900 km (1,200 mi) km of corridors had been identified for development of new expressways, of which 800 km (500 mi) were taken up under phase-1 of the project.

In the 2010s, the states of Maharashtra and Uttar Pradesh took keen interest in investing in expressways through dedicated expressway corporations of MSRDC and UPEIDA respectively. While Maharashtra led by MSRDC completed its second expressway with 701 km (436 mi) long Mumbai–Nagpur Expressway in June 2025, Uttar Pradesh had built four new expressways namely; Bundelkhand, Purvanchal, Agra–Lucknow and Yamuna expressways by the turn of early 2020s. On 21 May 2015, in a first for military aviation and expressway infrastructure in India, the Indian Air Force's Dassault Mirage 2000 successfully landed on the Yamuna Expressway near Mathura in a mock-drill to evaluate the utility of using highways and expressways for emergency landings by military aircraft.

In 2024, the government of India presented an ambitious 'Vision 2047' plan envisioning the construction of up to 50,000 km (31,000 mi) of access-controlled highways and expressways, with Indians gaining access to the expressways at a distance of 100–125 km (62–78 mi) from any point in the country. The ministry of road transport and highways (MoRTH) had also been finalising new guidelines to improve and standardise infrastructure along the already-developed highways with wayside amenities. Satellite-based tolling was also proposed to be started on 10-15 stretches in the same year.

Timeline

Sign in to keep reading

7 more chapters are free with a Lably account.

More in India