Lably
Skip to content

Purvanchal Expressway

  • 6 min read
  • 6 chapters

Related on Lably

Through Kilometre, India and Runway

The project was announced and laid down by the then Chief Minister of Uttar Pradesh Akhilesh Yadav as Lucknow-Azamgarh-Ballia Samajwadi Purvanchal Expressway in May 2015. Later, route was changed to Lucknow-Azamgarh-Ghazipur by the Yogi Adityanath government, and upon acquisition of around 95% of required land, foundation stone of Purvanchal Expressway was laid on 14 July 2018 by Prime Minister Narendra Modi. With a total project value of ₹22,494 crore, including the land acquisition cost, the Expressway was India's longest expressway at the time of completion.

The expressway is to be linked with Varanasi–Azamgarh highway through a separate link road. UPEIDA is also constructing the Gorakhpur Link Expressway, which will connect Jaitpur village in Gorakhpur district with Purvanchal Expressway at Salarpur village in Azamgarh district. Upon the completion of 17 km long, 4-lane wide Buxar–Ghazipur Elevated Road (Bharauli near Buxar to Haydaria in Ghazipur), Lucknow in Uttar Pradesh will be directly connected to Buxar, Arrah and Patna in Bihar by Purvanchal Expressway and NH-922.

5 industrial corridors will be set up alongside Purvanchal Expressway. As on Nov., 2023, the land has been identified and process for bainama is underway. In Ghazipur district, 25% bainama of land has been done till May, 2024.

Route

The Purvanchal Expressway connects Chand Saray village near Gosainganj in Lucknow district with Haydaria village on Mohammadabad–Buxar highway (NH-31) in Ghazipur district. It passes through 9 districts of Uttar Pradesh i.e. (from west to east) Lucknow, Barabanki, Amethi, Sultanpur, Ayodhya, Ambedkar Nagar, Azamgarh, Mau and Ghazipur.

Entry/ Exits

The following entry/exit points are present in the expressway:

Sign in to keep reading

5 more chapters are free with a Lably account.

More in India