Lably
Skip to content

Personal rapid transit

Public transport mode

  • 30 min read
  • 6 chapters
ULTra PRT ( personal rapid transit ) Production Vehicle #001
Skybum ( talk ) · CC BY 3.0

Related on Lably

Through Public transport, European Union and Pollution

PRT vehicles are sized for individual or small group travel, typically carrying no more than three to six passengers per vehicle. Guideways are arranged in a network topology, with all stations located on sidings, and with frequent merge/diverge points. This allows for nonstop, point-to-point travel, bypassing all intermediate stations. The point-to-point service has been compared to a taxi or a horizontal lift (elevator).

Numerous PRT systems have been proposed but most have not been implemented. As of November 2016, only a handful of PRT systems are operational: Morgantown Personal Rapid Transit (the oldest and most extensive), in Morgantown, West Virginia, has been in continuous operation since 1975. Since 2010 a 10-vehicle 2getthere system has operated at Masdar City, UAE, and since 2011 a 21-vehicle Ultra PRT system has run at London Heathrow Airport. A 40-vehicle Vectus system with in-line stations officially opened in Suncheon, South Korea, in April 2014. A PRT system connecting the terminals and parking has been built at Chengdu Tianfu International Airport, but as of 2026 remain non-operational, five years after the airport opened.

Overview

Most mass transit systems move people in groups over scheduled routes. This has inherent inefficiencies. For passengers, time is wasted by waiting for the next vehicle to arrive, indirect routes to their destination, stopping for passengers with other destinations, and often confusing or inconsistent schedules. Slowing and accelerating large weights can undermine public transport's benefit to the environment while slowing other traffic.

Personal rapid transit systems attempt to eliminate these wastes by moving small groups nonstop in automated vehicles on fixed tracks. Passengers can ideally board a pod immediately upon arriving at a station, and can – with a sufficiently extensive network of tracks – take relatively direct routes to their destination without stops.

The low weight of PRT's small vehicles allows smaller guideways and support structures than mass transit systems like light rail. The smaller structures translate into lower construction costs, smaller easements, and less visually obtrusive infrastructure.

As it stands, a citywide deployment with many lines and closely spaced stations, as envisioned by proponents, has yet to be constructed. Past projects have failed because of financing, cost overruns, regulatory conflicts, political issues, misapplied technology, and flaws in design, engineering or review.

However, the theory remains active. For example, from 2002 to 2005, the EDICT project, sponsored by the European Union, conducted a study on the feasibility of PRT in four European cities. The study involved 12 research organizations, and concluded that PRT:

  • would provide future cities "a highly accessible, user-responsive, environmentally friendly transport system which offers a sustainable and economic solution."
  • could "cover its operating costs, and provide a return which could pay for most, if not all, of its capital costs."
  • would provide "a level of service which is superior to that available from conventional public transport."
  • would be "well received by the public, both public transport and car users."

The report also concluded that, despite these advantages, public authorities will not commit to building PRT because of the risks associated with being the first public implementation.

The PRT acronym was introduced formally in 1978 by J. Edward Anderson. The Advanced Transit Association (ATRA), a group which advocates the use of technological solutions to transit problems, compiled a definition in 1988 that can be seen here.

Sign in to keep reading

5 more chapters are free with a Lably account.

More in Transportation