Development of the wind farm began in the 1980s. It is one of the first three major wind farm areas in California, along with those at Altamont and the Tehachapi passes.

As of May 2025, the wind farm consists of 667 wind turbines with a total rated capacity of 656 MW, built as part of 27 projects. The rated power output is somewhat understated, since the official database includes several unidentified turbines that are known to be in the 3-4 MW range. In December 2021 the site hosted more than 1,220 turbines, down from a peak of more than 4,200 in 1987. The reduction is the result of repowering, where many small, obsolete turbines are replaced with fewer, larger turbines.

The San Gorgonio Pass is now home to the Desert Peak Energy Facility, a battery energy storage system located adjacent to the Devers electrical substation. Phase I of the facility came online in 2023, while Phase II is anticipated in the coming years.

Utilities

Southern California Edison operates several high-voltage electrical transmission lines through the pass, leading to and from its Devers substation located north of Palm Springs. Path 46 500 kilo-volt (kV) power lines cross the pass on the northern edge of San Jacinto Peak. These lines effectively link the Los Angeles metropolitan area with the Palo Verde Nuclear Power Plant in Arizona. A single 500 kV line was upgraded to two lines in 2013, known as Devers-Palo Verde 2 (DPV2). The existing 220 kV transmission line heading west was doubled in 2021.