Sanibel Causeway

  • 7 min read
  • 4 chapters

Related on Lably

Through COVID-19 pandemic and Grassroots

Portions of the causeway were destroyed by Hurricane Ian on September 28, 2022 and reopened on October 19, 2022.

History

Background

As early as 1912, automobile ferries serviced Sanibel Island from the mainland at Punta Rassa. The idea of building a bridge from the mainland to the island was highly controversial amongst the early residents of the island, as many thought a bridge would ruin the beauty and isolated feel of the island, although one of the largest proponents of building a bridge was island resident Hugo Lindgren, who saw the island's potential and tried to convince Lee County to build a bridge. Despite the opinions of the islanders, it was clear that the ferries were insufficient by the mid-1950s as demand increased leading to long lines of vehicles waiting to cross the bay. Wildfires on the island in 1955 further convinced the county to build a bridge as it would improve access to the island for firefighters.

Planning and construction

An early proposal would have had a bridge running from Point Ybel (where Sanibel Lighthouse is currently located) to the mainland, since it was the shortest route. The current route was ultimately selected due to the bay being shallower and two causeway islands could be created by dredging. While Bailey Road was then selected as the terminus of the bridge on the island, Hugo Lindgren granted the county right-of-way through his property on the bay, which the county accepted. Construction on the entire causeway and the three original bridges lasted 15 months and cost $2.73 million. It was the last major project designed by Hector F.J. Estrup, civil engineer and owner of Caribbean Engineers.

Opening and early years

The Sanibel Causeway was completed and opened for traffic on May 26, 1963. Due to the causeway, Sanibel Island experienced major growth in the early 1970s leading to Sanibel's incorporation into Lee County's third city, which took place on November 5, 1974. Former congressman and CIA director Porter Goss served as Sanibel's first mayor.

By the early 1990s, the original bridges began showing signs of rapid deterioration due to the bay's saltwater, prompting the county to make major repairs. As a result, Lee County briefly proposed the idea of replacing the bridges with a single four-lane high-span bridge. This idea was abandoned due to opposition from island residents. Further repairs were made in 1997 as rapid deterioration from overall lack of maintenance and saltwater corrosion continued. In 2001, the county made plans to replace Bridges B and C, and make major repairs to Bridge A (the drawbridge).

During a routine inspection in early 2003, severe cracks were discovered underneath a 48-foot (15 m) deck section on Bridge B. After this discovery, all three of the bridges were very closely monitored, and the damaged section was braced with additional steel pilings. Bridge B's speed limit was temporarily lowered to 10 miles per hour (16 km/h), and the rest of the causeway's speed limit was lowered to 20 miles per hour (32 km/h). A temporary 10-ton weight limit was put in place. Lee County determined that the 48-foot (15 m) deck section needed to be completely replaced as soon as possible. After extensive preparations, the causeway was shut down all day on January 20, 2003. The deck section was replaced with a steel grate section. The replacement was completed quickly, and the causeway re-opened ahead of schedule. After this turn of events, Lee County reexamined its original plan for rehabilitating Bridge A (the drawbridge), and concluded that all three of the bridges needed to be replaced as soon as possible.

Replacing the bridges

Once it was decided to replace the drawbridge, there was a debate on replacing it with another drawbridge versus a high-span bridge. The county wanted a high-span, while a number of Sanibel residents wanted another drawbridge. Shortly before construction was set to begin on the high-span bridge, the city filed a lawsuit against Lee County in an attempt to stop construction. Sanibel claimed that Lee County did not maintain the bridges properly and used the toll revenue for other road projects. Lee County then filed a counter-lawsuit, claiming Sanibel was interfering with construction. A second lawsuit against Lee County was filed by a group of Sanibel residents who created a non-profit organization called "Save Our Bay, Inc." All of the lawsuits delayed construction and were eventually dismissed.

Construction of the high-span bridges commenced in May 2004. On August 13, 2004, the area was struck by Hurricane Charley, a Category 4 hurricane. The causeway received minor damage and was inspected before Sanibel residents were permitted to return to the island. In November 2004, the $3 toll was increased to $6 to finance construction. Construction on the high spans lasted three years and cost $137 million. An official grand opening ceremony for the bridges was held on September 8, 2007. The original drawbridge was later demolished, and their remains sunk into the water to create artificial reefs in the San Carlos Bay and the Gulf of Mexico.

In March 2020, Lee County-owned toll bridges were temporarily transitioned to all-electronic tolling due to the COVID-19 pandemic. This change became permanent on June 23, 2021. The $3 administrative fee for vehicles without transponders was suspended during the pandemic and was reinstated on October 1. The motorcycle discount plans were removed as part of the plan for a permanent transition to all-electronic tolling.

Hurricane Ian

On September 28, 2022, Hurricane Ian partially destroyed the causeway, and the mainland approach was heavily damaged. Both the islands of Sanibel and Captiva were cut off from the mainland United States by road. No deaths or injuries were confirmed by the Lee County Sheriff's Office. After undergoing emergency repairs, the causeway reopened to trucks on October 11, and reopened to all vehicular traffic on October 20.

Permanent repairs to the causeway were completed in 2024. As part of this work, improvements were made to the causeway’s design to better withstand future storms without cutting off access to the mainland.