Sơn La Dam

Dam in Mường La District, Sơn La Province

  • 1 min read
  • 3 chapters

Related on Lably

Through Black River (Asia) and Hydroelectricity

History

The project was proposed in the 1970s. Several studies were carried out, including by the Moscow Institute of Hydroelectric and Industry, Electricity and Power Distribution Company (Japan), Designing Research and Production Shareholding Company (Moscow) and SWECO (Sweden). In May 2000, the National Assembly of Vietnam postponed the decision due to lack of information on relocation and compensation plans and for feasibility studies for a scaled-down version of the dam. The project was approved by the National Assembly in December 2002. Construction of the dam began on 2 December 2005.

On 17 December 2010, the first turbine was connected to the power grid. It was officially put into operation on 7 January 2011. The second turbine was put to operation on 10 May 2011, the third turbine on 20 October 2011, the fourth turbine on 22 December 2011, the fifth turbine on 30 April 2012, and the sixth turbine on 26 September 2012. The project was completed on 20 December 2012.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Energy