South–North Water Transfer Project

Interlinking of major Chinese rivers

  • 9 min read
  • 6 chapters

Related on Lably

Through Hydrology and Water pollution

  • The Eastern Route through the course of the Grand Canal;
  • The Central Route from the upper reaches of the Han River (a tributary of the Yangtze) via the Grand Aqueduct to Beijing and Tianjin;
  • The Western Route, which goes from three tributaries of the Yangtze near Bayankala Mountain to the provinces of Qinghai, Gansu, Shaanxi, Shanxi, Inner Mongolia, and Ningxia.

Construction began in 2003, and the first phases of the Eastern and Central routes became operational in late 2014. The project is the largest water transfer scheme in the world, with an estimated investment exceeding 500 billion yuan (over $70 billion) to date. The South–North Water Transfer Project is intended to alleviate chronic water shortages in northern China, support economic development, and curb over-extraction of groundwater. However, it faces significant engineering, environmental, and social challenges.

History

The initial basis for this project was the lack of water in the Chinese north, which has a lot of agricultural land. Mao Zedong discussed the idea for a mass engineering project as an answer to China's water problems as early as 1952. He reportedly said, "there's plenty of water in the south, not much water in the north. If at all possible, borrowing some water would be good". Rapid industrial and agricultural growth since 1978 has resulted in a large increase of water usage in the north, raising water demand in comparison to supply.

Engineer Wang Mengshu initially proposed transferring water from the Songhua River in Jilin, around 900 km from Beijing. Before the construction, it was predicted that the development of the Bohai Economic Rim was significantly constrained by lack of water resources. The decision to start the project was also based on the strategic need to safeguard Beijing's water supply, which could theoretically also be met at similar cost through desalinization. In addition, water has been strategically diverted to Beijing from the surrounding regions in Hebei, which themselves lack water resources.

The project's real concept began in 2002, with China's Ministry of Water Resources, which developed Blueprints and established the Office of the Construction Committee for the South North Water Transfer Project, to oversee building. Construction of the project began in 2003. The East and Middle routes took nine and ten years to build, respectively. The East route began operating in 2013, and the West route saw waterflow by 2014.

In 2024, it was reported that 76.7 km³ of water had been transported in the ten years since operation began. Environmental impacts of the project have been monitored since its initiation, and it was found in 2020 that it greatly increased the water quality as well as the amount of groundwater in the north.