Sydney Harbour Tunnel

  • 5 min read
  • 5 chapters

Related on Lably

Through Anchor

The tunnel joins the Warringah Freeway at North Sydney and the Cahill Expressway at the entrance to the Domain Tunnel. It has two lanes in each direction, and runs at an angle of approximately thirty degrees (north to south) to the Sydney Harbour Bridge, which has eight lanes, with a tidal flow operation. In 2017, the tunnel was carrying around 96,000 vehicles per day.

Construction

The tunnel is made up of three sections: twin 900-metre (3,000 ft) land tunnels on the north shore, twin 400-metre (1,300 ft) land tunnels on the south shore and a 960-metre (3,150 ft) immersed tube (IMT) structure. The tunnel falls about 55 metres (180 ft) from the northern entrance and about 35 metres (115 ft) from the southern entrance to its deepest point, 25 metres (82 ft) below sea level. The construction was undertaken by Thiess Contractors.

The IMT structure consists of eight precast concrete units. The units were constructed over 100 kilometres (62 mi) away in a casting basin at Port Kembla and then towed to Sydney Harbour. A trench was dredged before the arrival of the IMTs and then the IMTs were lowered into the trench by a system of pontoons and control towers. After the IMTs were in place, the trenches were backfilled and then a rock armour was placed over the top to protect the units against marine hazards, such as anchors or sinking vessels. The land tunnels were constructed by a combination of driving and cut-and-cover techniques, designed to be strong enough to withstand the impact of earthquakes.

Ventilation

The northern end pylons of the Sydney Harbour Bridge were altered to allow for air exhaust from the tunnel to rise over the harbour. Bradfield Park on the northern side of the bridge also has air intakes. Fresh air is drawn by an underground ventilation station on the north shore and is pumped to all sections of the tunnel through vented ducts. The air supply uses fourteen axial flow fans, each up to 2.5 metres (8 ft 2 in) in diameter. The exhaust uses sixteen (eight in each northern pylon tower) fans that draw exhaust air through two underground ducts from the tunnel ventilation station and transfer the air to the top of the pylon. They can expel it at up to 1,500 m3/s (53,000 cu ft/s) – equivalent to changing all the air in the tunnel every two minutes with the capability of running in reverse in an emergency and all fans are rated for smoke extraction. Each of the fans has a duty of 53 to 103 m3/s (1,900 to 3,600 cu ft/s). The testing of the fans was one of the most comprehensive ever, covering flowrate and pressure, power measurements, sound levels, bearing vibration, x-raying of all impeller components, high-temperature tests at 200 °C (392 °F) for two hours, impeller strain, and 24-hour run tests for reversals.