Built to allow the Port of Shanghai to grow despite shallow waters near the shore, it allows berths with depths of up to 15 metres (49 ft) to be built, and can handle today's largest container ships. In mid-2011, port officials said the port was on track to move 12.3 million Twenty-foot equivalent units (TEUs) during the year, up from 10.1 million TEUs in 2010, overtaking port of Singapore to become the world's busiest container port. In 2015, the port handled 36.54 million TEUs, and by 2019, its throughput had increased to 43.35 million TEU.

Construction phases

In 2000 and 2001, the decision was made to commence construction on the first of four phases. The first two phases have nine berths in total along a 3 km (1.9 mi) quayside. The first phase, which opened in 2004, can accommodate 2.2 million containers annually and includes 10 quay cranes. The second phase was opened in December 2006, and comprises 72 hectares (180 acres) with 15 quay cranes. The third phase, opened in stages, was completed in 2010 with seven berths. The fourth phase, which began trial operation on Dec. 10, 2017, will add 4 million Twenty-foot equivalent units (TEUs) to the port's annual capacity.

The total cost of building the port may reach US$12 billion over 20 years. When complete, the port will have 30 berths capable of handling 15 million TEUs annually.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Geography