Lably
Skip to content

Apollo 5

Uncrewed first test flight of the Apollo Lunar Module

  • 8 min read
  • 5 chapters

Related on Lably

Through Moon

Like Apollo 4, this flight was long delayed, due in part to setbacks in development of the LM, manufactured by Grumman Aircraft. The original Saturn IB rocket that was to take the first LM (LM-1) to space was taken down during the delays and replaced with the one that would have launched Apollo 1 if the spacecraft fire that killed three astronauts had not occurred. LM-1 arrived at the Kennedy Space Center in June 1967; the following months were occupied in testing and placing the LM atop the Saturn IB. After final delays due to equipment trouble, the countdown began on January 21, 1968, and the space vehicle was launched the following day.

Once the craft reached orbit and the LM separated from the S-IVB booster, the program of orbital testing began, but a planned burn was aborted automatically when the Apollo Guidance Computer detected the craft was not going as fast as planned. Flight Director Gene Kranz and his team at Mission Control in Houston quickly decided on an alternate mission, during which the mission's goals of testing LM-1 were accomplished. The mission was successful enough that a contemplated second uncrewed mission to test the LM was cancelled, advancing NASA's plans to land an astronaut on the Moon by the end of the 1960s.

Background

In 1961, United States President John F. Kennedy challenged the United States to land an astronaut on the Moon by the end of the decade, with a safe return to Earth. After considerable debate, NASA (the US government's spaceflight agency) decided in late 1962 that lunar missions would use a lunar orbit rendezvous in which the complete Apollo spacecraft would be propelled towards lunar orbit by the Saturn V launch vehicle's third stage (called the S-IVB). Once in lunar orbit, those astronauts who would land on the Moon would enter what was then called the lunar excursion module (LEM) (later called the lunar module (LM)). This craft would separate from the Apollo's command and service module (CSM) and land on the Moon. When the astronauts were ready to return, they would enter the LM, take off, and re-dock with the CSM. Once the crew reentered the CSM, they would discard the lunar module and return to Earth in the CSM. In 1962, NASA invited eleven companies to bid for the contract to construct the LM. On November 7, 1962, NASA announced that it had awarded the contract to Grumman in Bethpage, New York.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Astronomy