Apollo 9

Third crewed mission of the Apollo space program

  • 22 min read
  • 7 chapters
Apollo 9 Command/Service Modules (CSM) nicknamed "Gumdrop" and Lunar Module (LM), nicknamed "Spider" are shown docked together as Command Module pilot David R. Scott stands in the open hatch. Astronau
NASA / Russell L. Schweickart · Public domain

Related on Lably

Through Spacecraft and Soviet Union

The mission was flown to qualify the LM for lunar orbit operations in preparation for the first Moon landing by demonstrating its descent and ascent propulsion systems, showing that its crew could fly it independently, then rendezvous and dock with the CSM again, as would be required for the first crewed lunar landing. Other objectives of the flight included firing the LM descent engine to propel the spacecraft stack as a backup mode (as was required on the Apollo 13 mission), and use of the portable life support system backpack outside the LM cabin.

After launching on March 3, 1969, the crew performed the first crewed flight of an Apollo Lunar Module, the first docking and extraction of the same, one two-person spacewalk (EVA), and the second docking of two crewed spacecraft—two months after the Soviets performed a spacewalk crew transfer between Soyuz 4 and Soyuz 5. The mission concluded on March 13 and was a complete success. It proved the LM worthy of crewed spaceflight, setting the stage for the dress rehearsal for the lunar landing, Apollo 10, before the ultimate goal, landing on the Moon.

Mission background

In April 1966, McDivitt, Scott, and Schweickart were selected by Director of Flight Crew Operations Deke Slayton as the second Apollo crew. Their initial job was as backup to the first Apollo crew to be chosen, Gus Grissom, Ed White, and Roger Chaffee, for the first crewed Earth orbital test flight of the block I command and service module, designated AS-204. Delays in the block I CSM development pushed AS-204 into 1967. The revised plan had the McDivitt crew scheduled for the second crewed CSM, which was to rendezvous in Earth orbit with an uncrewed LM, launched separately. The third crewed mission, to be commanded by Frank Borman, was to be the first launch of a Saturn V with a crew.

On January 27, 1967, Grissom's crew was conducting a launch-pad test for their planned February 21 mission, which they named Apollo 1, when a fire broke out in the cabin, killing all three men. A complete safety review of the Apollo program followed. During this time Apollo 5 took place, an uncrewed launch to test the first lunar module (LM-1).

Under the new schedule, the first Apollo crewed mission to go into space would be Apollo 7, planned for October 1968. This mission, which was to test the block II command module, did not include a lunar module. In 1967, NASA had adopted a series of lettered missions leading up to the crewed lunar landing, the "G mission", completion of one being a prerequisite to the next. Apollo 7 would be the "C mission", but the "D mission" required testing of the crewed lunar module, which was running behind schedule and endangering John F. Kennedy's goal of Americans walking on the Moon and returning safely to Earth by the end of the 1960s. McDivitt's crew had been announced by NASA in November 1967 as prime crew for the D mission, lengthy testing of the command and lunar modules in Earth orbit.

Seeking to keep Kennedy's goal on schedule, in August 1968, Apollo Program Manager George M. Low proposed that if Apollo 7 in October went well, Apollo 8 would go to lunar orbit without a LM. Until then, Apollo 8 was the D mission with Apollo 9 the "E mission", testing in medium Earth orbit. After NASA approved sending Apollo 8 to the Moon, while making Apollo 9 the D mission, Slayton offered McDivitt the opportunity to stay with Apollo 8 and thus go to lunar orbit. McDivitt turned it down on behalf of his crew, preferring to stay with the D mission, now Apollo 9.

Apollo 7 went well, and the crews were switched. The crew swap also affected who would be the first astronauts to land on the Moon, for when the crews for Apollo 8 and 9 were swapped, so were the backup crews. Since the rule of thumb was for backup crews to fly as prime crew three missions later, this put Neil Armstrong's crew (Borman's backup) in position to make the first landing attempt on Apollo 11 instead of Pete Conrad's crew, who made the second landing on Apollo 12.