Through World War I

The other main UK gas terminals which receive gas from the UK continental shelf are at St Fergus, Aberdeenshire; Easington, East Riding of Yorkshire; Theddlethorpe, Lincolnshire (now decommissioned); CATS Terminal, Teesside; and Rampside gas terminal, Barrow, Cumbria.

History

The Bacton complex which covers an area of about 180 acres (73 ha) opened during 1968. It has a frontage of 1 km (3200 feet) along the cliff top. It was initially built by Shell-Esso, Phillips Petroleum-Arpet Group, Amoco-Gas Council. Planning permission had been given on 16 June 1967 by Anthony Greenwood, Baron Greenwood of Rossendale. The Leman field began production on 13 August 1968 (joint Shell-Esso and joint Amoco-Gas Council), the Hewett field (Phillips Petroleum-Arpet Group) began operations in July 1969 and the Indefatigable field (joint Shell-Esso and joint Amoco-Gas Council) began production in October 1971. Construction of the £5 million Phillips-Arpet plant began in April 1968. Gas from the Shell-Esso part of the Leman field was delivered to Bacton via a 34-mile-long pipeline. A 36-inch diameter 140-mile-long pipeline (Number 2 feeder main) costing £17 million was built by Italsider from Bacton to the National Transmission System near Rugby. When initially completed in 1968 the terminal had a total gas throughput capacity of 3,955 million cubic feet (112 million cubic metres) per day at standard conditions. The Gas Council marketed the new North Sea gas as High Speed Gas.

A. Monk Ltd of Padgate built the 1968 Shell plant.

Sign in to keep reading

11 more chapters are free with a Lably account.

More in Energy