Lably
Skip to content

British logistics in the Siegfried Line campaign

  • 63 min read
  • 7 chapters

Related on Lably

Through Coal

A new base was developed around Brussels, and an advanced base area around Antwerp. It was decided to shut down the Rear Maintenance Area (RMA) in Normandy, where some 300,000 long tons (300,000 t) of supplies were still held. This included 15,000,000 rations, which were gradually eaten by the troops in the RMA. Stores still required by the 21st Army Group were moved forward to the new advanced base, and the rest returned to the War Office for disposal. To get the railway system in operation again required the reconstruction of bridges and the importation of additional locomotives. Petrol was brought in tankers and over the Operation Pluto pipeline. Civilian labour was utilised at the bases in a variety of tasks to enable military personnel to be released for service in forward areas. By the end of 1944, some 90,000 civilians were employed by the 21st Army Group, of whom half were employed in workshops in the advanced base, and 14,000 at the port of Antwerp.

British logistics in this campaign had access to enormous resources. The problem the administrative staffs faced was not whether something could be accomplished, but how soon it could be done. Procedures had already been developed and honed in earlier campaigns, and were improved upon as administrative staffs steadily became more experienced. The maintenance system had both capacity and flexibility, and was capable of supporting both fast-moving and slow-tempo operations.

Background

In the first weeks after the Allied invasion of Normandy, known as Operation Overlord, commenced on D-Day, 6 June 1944, the Anglo-Canadian forces were maintained over the Gold, Juno and Sword Beaches, and the small ports of Port-en-Bessin and Courseulles. Construction of the artificial Mulberry harbour commenced on 7 June and by 16 June it was handling 2,000 long tons (2,000 t) per day. The Mulberry accounted for about 12.5 per cent of the Allied tonnage landed in June, compared to 25 per cent for Cherbourg and the small ports, and 62.5 per cent over the beaches, the capacity of which had been underestimated in the planning phase. German resistance was stubborn, and casualties were heavy, although neither as high as anticipated, nor as great as those suffered by the American forces. The bulk of the German forces were drawn towards the British sector, with the result that the advance was much slower than planned, and the lodgement area was considerably smaller. By the end of July, the chances of capturing the Seine ports any time soon looked slim, and work commenced on winterisation of the Mulberry harbour, building up stocks to cater for deteriorating weather, developing the ports and Caen and Ouistreham, and opening the Canal de Caen à la Mer which ran between them.

At the same time, preparations were also made for the possibility of a sudden breach of the German defences requiring a rapid exploitation. When the American Operation Cobra, launched on 25 July 1944, succeeded in breaking through the German defences, six additional transport companies were shipped from the United Kingdom. Plans were drawn up to establish an advanced base in the Le Havre area on the assumption that the Germans would try to establish a new front along the Somme. In the event, the advance proceeded further and faster than anticipated. The British Second Army's XXX Corps crossed the Seine at Vernon on 25 August, followed by the XII Corps at Les Andelys two days later, and both corps were across the Somme by 1 September.

To facilitate the advance, the transport of VIII Corps was appropriated, as was most of that normally assigned to working the beaches and ports. To permit this, the tonnage being shipped from the UK to France was reduced from 16,000 to 7,000 long tons (16,300 to 7,100 t) per day; the difference being made up by drawing down stocks held in the Rear Maintenance Area (RMA) in Normandy. Along with the new units from the UK, these steps increased the number of transport units available to the Second Army from 6 to 39 companies. Until a new army roadhead could be established, supplies were stocked forward as far as possible, at interim depot areas known as "cushions". Brussels was liberated on 3 September, and Antwerp was captured virtually intact on 4 September, but it could not be used as a port until the Germans were cleared from the Scheldt approaches, through which ships had to pass to reach the port.

Meanwhile, the Canadian First Army's II Corps had crossed the Seine in the Pont-de-l'Arche area on 27 August, whilst British I Corps forced a crossing three days later. At this time there were no bridges over the Seine between Rouen and the sea, and no intact ones upstream as far as Paris partly due to Royal Air Force (RAF) attacks. A 6-knot (11 km/h) tidal bore ran twice a day, giving a tide range of 8 feet (2.4 m). This precluded the use of pontoon bridges, and restricted the times when DUKWs (amphibious trucks) and ferries could operate. Unlike the British corps, the II Canadian Corps did not operate a field maintenance centre (FMC), so supplies were drawn from No. 3 Army Roadhead at Lisieux, which opened on 26 August, or from No. 3A Army Roadhead at Elbeuf, which was opened on 2 September. The First Canadian Army opened No. 5 Army Roadhead between Dieppe and Abbeville on 3 September, and No. 7 Army Roadhead in the Bethune area on 15 September. The lack of FMCs was compensated for to some extent by the creation of temporary "kangaroo dumps" that were established in forward areas to support the advance. The Canadian roadheads could not be satisfactorily stocked in August or September as Second Army had priority for supplies. These were however plentiful in the main depots at No. 1 Roadhead in the RMA, but this was now up to 300 miles (480 km) behind the front lines.

Sign in to keep reading

6 more chapters are free with a Lably account.

More in Modern