China Fusion Engineering Test Reactor

Tokamak

  • 9 min read
  • 4 chapters

Related on Lably

Through Sustainable energy, Carbon footprint and Renewable energy

The CFETR utilises and intends to build upon pre-existing nuclear fusion research from the International Thermonuclear Experimental Reactor (ITER) program in order to address the gaps between ITER and the next generation thermonuclear plant and successor reactor class to ITER, the Demonstration Power Plant (DEMO).

As of 2019, three domestic fusion test reactors are in operation in China. These include EAST in ASIPP at Hefei, HL-2A(M) at the Southwestern Institute of Physics (SWIP) at Chengdu and J-TEXT located at Huazhong University of Science and Technology in Wuhan. Additionally, as of 2021, in an effort to more accurately simulate a potentially functionally operational CFETR, the HL-2A at SWIP was upgraded to the HL-2M. Construction for the HL-2M was completed in November 2019, and the device was commissioned on December 4, 2020.

The conceptual design of the CFETR, completed in 2015, is largely based on the design of these three domestic fusion reactors. Construction of the CFETR will likely begin in the 2020s, with expected completion by the 2030s.

Aims and objectives

The China Fusion Engineering Test Reactor (CFETR) will operate in two phases. In the first phase, the CFETR will be required to demonstrate steady state operation and tritium self-sufficiency with a tritium breeding ratio > 1. Moreover, in Phase 1, the CFETR should demonstrate generation of fusion power up to 200MW.

The second phase, the DEMO validation phase, requires the CFETR to generate power over 1 GW. More generally, the CFETR will also serve as a research and development tool for the testing of various structural and functional materials to identify or develop a material with a high neutron flux resistance.