Nuclear power in China

  • 21 min read
  • 8 chapters

Related on Lably

Through China, Watt and Kilowatt-hour

Nuclear power has been looked into as an alternative to coal due to increasing concerns about air quality, climate change and fossil fuel shortages. China aims to generate 200 GWe by 2035, produced by 150 additional reactors, at a cost of US$440 billion. China has two major nuclear power companies, the China National Nuclear Corporation operating mainly in northeast China, and the China General Nuclear Power Group operating mainly in southeast China.

China aims to maximize self-reliance on nuclear reactor technology manufacturing and design, although international cooperation and technology transfer are also encouraged. Advanced pressurized water reactors (PWR) such as the Hualong One, CAP-1000, Guohe One are the mainstream technology in the near future, and the Hualong One is also exported to Pakistan and will be exported to Kazakhstan. China plans to build as many as thirty nuclear power reactors in countries involved in the Belt and Road Initiative by 2030.

By 2050, fast neutron reactors are planned as the primary reactor type, with a planned 1400 GWe capacity by 2100, and with the CFR-600 China's Thorium Molten Salt Reactor project aims to utilize the thorium fuel cycle, including the TMSR-LF1 prototype operational since 2023. China is involved in the development of nuclear fusion reactors through its participation in the ITER project. It also conducts domestic research through facilities such as the EAST Tokamak in Hefei, as well as advance experimental projects including the Burning Plasma Experimental Superconducting Tokamak and the CFETR, which aim to develop DEMO-class reactors with power output exceeding >1 GW.

Nuclear research in China began during the 1950s, centered at the Institute of Atomic Energy, with assistance from the Soviet Union, and primarily to develop China's nuclear weapons. Following China's reform and opening up, the military nuclear industry shifted towards civilian power, with the first nuclear power plant, Qinshan-1, connecting to the grid in 1991. In the 21st century, China imported many gigawatt-class PWR reactor designs: the French EPR, Russian VVER-1000, and US AP1000.

History

1950–1958

In the Cold War, Beijing's initial motivation for developing nuclear power was largely driven by security concerns. Between 1950 and 1958, Chinese nuclear power construction heavily relied on cooperation with the USSR. The first initiative was launched with the establishment of the China-Soviet Union Nonferrous Metals and Rare Metals Corporation and the first central atomic research facility, the Institute of Atomic Energy of the Chinese Academy of Sciences in Beijing. In February 1955, a chemical separation plant for the production of weapons-grade U-235 and plutonium was created with Soviet aid in Xinjiang and in April the Changchun Institute of Atomic Energy was established. Several months later, on 29 April 1955, the Sino-Soviet Atomic Cooperation Treaty was signed. The China National Nuclear Corporation (CNNC) was also established in 1955. In addition to cooperation with the USSR, China began to learn nuclear technology by sending students to the USSR. In December 1958, nuclear power development had become the top priority project in the Draft Twelve Year Plan for Development of Science and Technology.

1959–1963

The second phase was characterized by the goal of being completely self-sufficient in nuclear power development. In June 1959, the USSR officially ended any forms of nuclear aid to China, withdrawing Soviet technicians. China suffered but continued nuclear power development through massive research and input. In order to rapidly strengthen its atomic energy industry, the Central Committee decided that China must dedicate further resources exclusively to nuclear-related activities. Consequently, the Institute of Atomic Energy created branch institutes of research organizations in every province, major city, and autonomous region. By the end of 1963, China had built more than forty chemical separation plants for the extraction of uranium and thorium. In the year between 1961 and 1962, China accomplished significant achievements in nuclear development which consolidated future applications. From 1959 to 1963, a gaseous diffusion plant utilizing a large 300 MW reactor was under construction at Lanzhou. It was estimated that the Chinese invested over $1.5 billion in the construction of this plant.

1964 – 2012

After the explosive progress in the 1950s, Chinese nuclear development slowed down, possibly because of the Cultural Revolution, so only one nuclear test took place in 1970. On 8 February 1970, China issued its first nuclear power plan, and the 728 Institute (now known as Shanghai Nuclear Engineering Research and Design Institute) was established.

Qinshan Nuclear Power Plant, constructed in 1984, was the first independently designed and built nuclear power plant. It was successfully connected to the grid on 15 December 1991. The reactor is of type CNP-300.

After the 1986 Chernobyl disaster, Beijing emphasized that it would not change its nuclear development policy, but would still explore a national emergency management strategy.

One year after Chernobyl, China began construction on the Daya Bay nuclear plant, located between Shenzhen and Hong Kong. Over 72% of Hong Kong residents surveyed opposed the plant, and more than one million residents signed a petition against the project. Despite this public protest, Beijing pushed forward with construction, with then-Minister of Nuclear Industry Jiang Xinxiong saying, "The government has not changed and will not change its decision to build a nuclear plant at Daya Bay," at a press conference in 1986.

In 1991, China created the National Nuclear Accident Emergency Committee to plan and coordinate nationwide nuclear accident emergency preparations and rescue operations.

Along with the reform and opening up, China continued to demand expansion of its electricity sector. As part of China's tenth Five-Year Plan (2001–2005), a key component of energy policy was to "guarantee energy security, optimize energy mix, improve energy efficiency, protect the ecological environment.” By 2002, China had two operational nuclear power plants.

In 2007, the Hu Jintao administration set the goal of doubling the amount of nuclear energy in China's total installed capacity, which resulted in the major growth of business opportunities in China's nuclear power sector.

Immediately after the 2011 Fukushima nuclear accident, Beijing froze all reactor approvals pending a safety review. By late 2012, the Chinese State Council approved the Nuclear Power Safety Plan and the Mid- and Long-Term Nuclear Development Plan, resuming reactor deployment as long as new projects met stricter Generation III safety standards.

In 2012, Hu emphasized "the irreplaceable role of nuclear energy in ensuring energy security and climate change".

2013 – present

The nuclear safety plan of 2013 stated that beyond 2016, only Generation III plants would be started, and until then only a very few Generation II+ plants would be started.

In 2014, China still planned to have 58 GW of capacity by 2020. However, due to reevaluation following the Fukushima Daiichi nuclear disaster in Japan, few plants commenced construction after 2015, and this target was not met.

In 2019, China had a new target of 200 GWe of nuclear generating capacity by 2035, which is 7.7% of the predicted total electricity generating capacity of 2600 GWe. By the end of December 2020, the total number of nuclear power units in operation in China reached 49, with a total installed capacity of 51 GWe, ranking third in the world in terms of installed capacity and second in the world in terms of power generation in 2020; with 16 nuclear power units under construction, the number of units under construction and installed capacity have ranked first in the world for many years. By 2035, nuclear power is planned to account for 10% of electricity generation.

As of 2020, China had 41 additional nuclear reactors planned and 168 proposed reactors under consideration. China's under-construction reactors accounted for 27% of worldwide reactors under construction. As of at least 2023, China's goals for nuclear power expansion are the most ambitious of any country.

Nuclear Power Capacity in China by StatusData as of January 2026 — Gross electrical capacity (GW)

In 2021, China's Environmental Protection and Resources Conservation Committee announced an action plan which emphasized the deployment and development of next-generation nuclear power technology to reduce carbon dioxide emissions.

In 2024, the Information Technology and Innovation Foundation think tank stated that globally, China leads or matches in commercial nuclear power technology, and is likely 10 to 15 years ahead in Generation IV reactor technology.

Between 2015 and 2024, China built 37 reactors with an average time from first concrete to grid connection of 6.3 years (beating the global average of 9.4 years). China also recorded the fastest build time in that period at just 4.1 years.

As of 2025, China is the world's largest investor in nuclear energy, with 29 reactors currently under construction. This represents nearly half of all nuclear reactors being built globally. China is projected to surpass the United States as the world's leading producer of nuclear energy in the coming years. This expansion is consistent with the country's stated climate strategy. In terms of total prospective capacity, China leads with nearly 125 GWe in announced and under-construction projects, almost four times that of second-place Russia.