The introduction of CRH series was a major part of the sixth national railway speedup, implemented on April 18, 2007. By the end of 2020, China Railway High-speed provided service to all provinces in China, and operated just under 38,000 km (24,000 mi) passenger tracks in length, accounting for about two-thirds of the world's high-speed rail tracks in commercial service. China has revealed plans to extend the HSR to 70,000 km by year 2035. It is the world's most extensively used railway service, with 2.29 billion bullet train trips delivered in 2019 and 2.16 billion trips in 2020, bringing the total cumulative number of trips to 13 billion as of 2020.

Over 1000 sets of rolling stock are operated under the CRH brand including Hexie CRH1/2A/5 that are designed to have a maximum speed of 250 km/h (160 mph), and CRH2C/3 have a maximum speed of 350 km/h (220 mph). The indigenous designed CRH380A have a maximum test speed of 416.6 km/h (258.9 mph) with commercial operation speed of 350 km/h. The fastest train set, CRH380BL, attained a maximum test speed of 487.3 km/h (302.8 mph). In 2017, the China Standardized EMU brand including CR400AF/BF and CR200J joined China Railway High-speed and are designated as Fuxing together with letters CR (China Railway). With a gradual plan, the CR brand is going to replace the current CRH brand in service.

Depending on their speed, there are 3 categories of high speed trains, G, D and C (G and some C being the fastest at 350 km/h, D having a speed of 250 km/h and C having a speed of 200 km/h).

High-speed rail network

High-speed rail services were first introduced in 2007 operating with CRH rolling stock. Those run on existing lines that have been upgraded to speeds of up to 250 km/h (160 mph) and on newer dedicated high-speed track rated up to 350 km/h (220 mph).

China will continue to operate the largest high-speed rail (HSR) network in the world by the end of 2021, with a length of over 40,000 km (24,855 mi). Beijing to Hong Kong High Speed Railway, the longest HSR route in the world, stretches 2,440 km (1,516 mi).

CRH service on dedicated high-speed lines

CRH service on upgraded conventional lines

As of September 2010, there were 2,876 kilometres (1,787 mi) of upgraded conventional railways in China that can accommodate trains running speeds of 200 to 250 km/h. Over time with the completion of the national high-speed passenger-dedicated rail network, more CRH service will shift from these lines to the high-speed dedicated lines.

A. Intercity service (typically, listed in schedules as C-series or D-series trains):

B. Long-haul service (typically, listed in schedules as G-series or D-series trains):

Overnight high-speed trains

Unlike the "conventional" (non-CRH trains), which run round the clock, most high-speed rail lines operations shut down each night. There are several sleeper EMU services (abbreviated 动卧, dòngwò) running on the upgraded rail or high-speed lines operated with CRH1E and CRH2E trains.

Conventional higher-speed Z-series overnight rail services may also use certain sections of the high-speed rail network; e.g., the planned Shanghai-Chengdu train Z121/2/3/4 will use the Huhanrong PDL from Nanjing to Wuhan.

With the schedule change planned for December 21, 2012, some of these trainsets will be re-purposed to also provide overnight high-speed service between Shanghai and Xi'an North. In the 2014, Chunyun season, overnight HSR trains first ran on Beijing-Guangzhou (Jingguang) and other lines.

In November 2016, CRRC Changchun unveiled CRH5E bullet train carriages with sleeper berths. Made in the CRRC factory in Changchun and nicknamed Panda, they are capable of running at 250 km/h, operate at -40 degrees Celsius, have Wi-Fi hubs and contain sleeper berths that fold into seats during the day. In 2017, CRRC unveiled a high speed train with double decked sleeper "capsules" classed as the CRH2E series high speed rail train. On January 5, 2019, the CR200J entered service replacing many locomotive-hauled trains.