Confederation Bridge

Canadian bridge from Prince Edward Island to the mainland

  • 16 min read
  • 5 chapters
Aerial view of the Confederation Bridge from the Prince Edward Island side, looking southwest across the Northumberland Strait toward Cape Jourimain, New Brunswick.
Quintin Soloviev · CC BY 4.0

Related on Lably

Through COVID-19 pandemic, World War II and Tide

The bridge was designed by French engineer Jean M. Muller who was a specialist of multiple span match-casting bridges. Construction took place from 1 November 1993 until May 1997 and cost C$1.3 billion. Before its official naming, Prince Edward Islanders often referred to the bridge as the "Fixed Link". It officially opened to traffic on May 31, 1997.

Structure

The bridge is a two-lane toll bridge that carries the Trans-Canada Highway between Borden-Carleton, Prince Edward Island (at Route 1) and Cape Jourimain, New Brunswick (at Route 16).

It is a multi-span balanced cantilever bridge with a post-tensioned concrete box girder structure. Most of the curved bridge is 40 metres (131 ft) above water; there is a 60-metre (197-foot) navigation span for ship traffic. The bridge rests on 62 piers, of which the 44 main piers are 250 metres (820 ft) apart. The bridge is 11 metres (36 ft) wide.

The speed limit on the bridge is 80 kilometres per hour (50 mph) but can vary with wind and weather conditions. When travelling at the speed limit, it takes about 12 minutes to cross the bridge.