Great Belt Bridge

Bridge–tunnel road and railway crossing of the Great Belt in Denmark

  • 12 min read
  • 6 chapters
Storebæltsbroen as seen from 'Bro og naturcenter', Sjælland, Denmark.
Sendelbach ( talk ) · Public domain

Related on Lably

Through Europe, International Court of Justice and Rust

The term Great Belt Bridge commonly refers to the suspension bridge, although it may also be used to mean the box-girder bridge, especially when discussing the railway, or the link in its entirety. Together with the New Little Belt Bridge, the Great Belt link provides a continuous road and rail connection between Copenhagen and the Danish mainland (the Jutland Peninsula of the European continent). It has the world's seventh-longest main span (1.6 km (1 mi)). Operation and maintenance of the bridge are performed by A/S Storebælt under Sund & Bælt. Maintenance and the original construction are financed by tolls on vehicles and trains making use of the bridge.

Officially named the East Bridge, the suspension bridge was designed by the Danish firms COWI and Ramboll, and the architecture firm Dissing+Weitling. The construction and assembly of the suspended deck were carried out by the company Alsthom Sdem with the consultancy of the Italian Studio de Miranda Associati under the direction of Mario de Miranda. The link replaced the Great Belt ferries service, which had been the primary means of crossing the Great Belt. After more than 50 years of debate, the Danish government decided in 1986 to construct a link; the bridge opened to rail traffic in 1997 and to road traffic in 1998, at the time the world's second longest, beaten by the Akashi Kaikyō Bridge opened a few months previously. At an estimated cost of DKK 21.4 billion (EUR 2.8 billion) (1988 prices), the link is the largest construction project in Danish history. It has reduced travel times significantly; previously taking one hour by ferry, the Great Belt can now be crossed in ten minutes. This link, together with the Øresund Bridge (built 1995–1999) and the Little Belt Bridge, have together enabled driving from mainland Europe to Sweden through Denmark.

History

The Great Belt ferries entered service between the coastal towns of Korsør and Nyborg in 1883, connecting the railway lines on either side of the Belt. In 1957, road traffic was moved to the Halsskov–Knudshoved route, about 1.5 kilometres to the north and close to the fixed link.

Construction drafts for a fixed link were presented as early as the 1850s, with several suggestions appearing in the following decades. The Danish State Railways, responsible for the ferry service, presented plans for a bridge in 1934. The concepts of bridges over Øresund (152 million DKK) and Storebælt (257 million DKK) were calculated around 1936. In 1948, the Ministry for Public Works (now the Ministry of Transport) established a commission to investigate the implications of a fixed link.

The first law concerning a fixed link was enacted in 1973, but the project was put on hold in 1978 as the Venstre (Liberal) party demanded postponing public spending. Political agreement to restart work was reached in 1986, with a construction law (Danish: anlægslov) being passed in 1987.

The design was carried out by the engineering firms COWI and Ramboll together with Dissing+Weitling architecture practice.

Construction of the link commenced in 1988. In 1991, Finland sued Denmark at the International Court of Justice, on the grounds that Finnish-built mobile offshore drilling units would be unable to pass beneath the bridge. The two countries negotiated a financial compensation of 90 million Danish kroner, and Finland withdrew the lawsuit in 1992.

A European Court of Justice ruling in 1993 found that a contractual condition requiring use of local labour and local materials in constructing the bridge was incompatible with the principles of the EEC Treaty.

In 2014 the danish ministry of transportation released a socio-economic impact study detailing how the link is projected to create 379 billion DKK of socio-economic value after 50 years of use.

In 2022, the bridge was crossed as part of the route of Stage 2 of the 2022 Tour de France.