Deepwater Horizon

Former offshore oil drilling rig

  • 9 min read
  • 5 chapters

Related on Lably

Through Offshore drilling, Earth Day and Seabed

Built in 2001 in South Korea by Hyundai Heavy Industries, the rig was commissioned by R&B Falcon (a later asset of Transocean), registered in Majuro, and under lease to BP from 2001 until September 2013. In September 2009, the rig drilled the deepest oil well in history at a vertical depth of 35,050 ft (10,683 m) and measured depth of 35,055 ft (10,685 m) in the Tiber Oil Field at Keathley Canyon block 102, approximately 250 miles (400 km) southeast of Houston, in 4,132 feet (1,259 m) of water.

Design

Deepwater Horizon was a fifth-generation, RBS-8D design (i.e. model type), deepwater, dynamically positioned, column-stabilized, semi-submersible mobile offshore drilling unit, designed to drill subsea wells for oil exploration and production using an 18.75 in (476 mm), 15,000 psi (100,000 kPa) blowout preventer, and a 21 in (530 mm) outside diameter marine riser.

Deepwater Horizon was the second semi-submersible rig constructed of a class of two, although Deepwater Nautilus, its predecessor, is not dynamically positioned. The rig was 396 by 256 ft (121 by 78 m) and capable of operating in waters as deep as 8,000 feet (2,400 m), to a maximum drill depth of 30,000 ft (9,100 m). In 2010, it was one of approximately 200 deepwater offshore rigs capable of drilling in waters deeper than 5,000 ft (1,500 m). Its American Bureau of Shipping (ABS) class notations were "A1, Column Stabilized Drilling Unit, AMS, ACCU, DPS-3".

In 2002, the rig was upgraded with "e-drill", a drill monitoring system whereby technical personnel based in Houston, Texas, received real-time drilling data from the rig and transmitted maintenance and troubleshooting information.

Advanced systems had a major role in the rig's operation, from pressure and drill monitoring technology, to automated shutoff systems and modelling systems for cementing. The OptiCem cement modelling system, used by Halliburton in April 2010, played a crucial part in cement slurry mix and support decisions. These decisions became a focus for investigations of the explosion on the rig that month.