Lably
Skip to content

High-speed rail in India

  • 10 min read
  • 5 chapters

Related on Lably

Through Government of India, Ahmedabad and England

Indian Railways operates India's railway system and comes under the purview of the Ministry of Railways of Government of India. As of 2023, it maintains over 108,706 km (67,547 mi) of tracks and operates over 13,000 trains daily. According to the Ministry of Railways, a route capable of supporting trains operating at more than 160 km/h (100 mph) is considered as a higher speed or semi-high speed rail line.

Earlier steam locomotive operated trains largely operated below 100 km/h (62 mph). With the introduction of electric locomotives in the later 1920s and newer steam locomotives, speeds of 100 km/h (62 mph) were achieved. With the movement to AC traction in the late 1950s and introduction of diesel locomotives, commercial speeds of up to 120 km/h (75 mph) was achieved in the late 1960s. With the introduction of high power electric locomotives in the 1990s, operating speeds of 130 km/h (81 mph) was achieved with further developments leading to maximum speeds of 160 km/h (100 mph) being realised in the early 2010s. Vande Bharat, an electric multiple unit (EMU), introduced in 2018, is the fastest operational train-set and is capable of reaching 183 km/h (114 mph).

The first high-speed railway corridor between Mumbai and Ahmedabad of about 508 km (316 mi) is currently under construction with a designed maximum operational speed of 350 km/h (220 mph) and is expected to be operational fully by 2028-29. As of 2023, eight such corridors have also been proposed.

History

The history of the Indian Railway began in 1832 with the proposal to construct the first railway line in India at Madras. In 1837, the first train ran on Red Hill railway line between Red Hills and Chintadripet in Madras and was hauled by a rotary steam engine imported from England. In 1853, the first passenger train ran between Bombay and Thane which covered a distance of 54 km (34 mi) in 57 minutes, averaging a speed of 57 km/h (35 mph). Earlier trains ran using steam locomotives, where barely reached speeds of 90 km/h (56 mph). With the introduction of WP class locomotives in 1947, speeds of 100 km/h (62 mph) were operated commercially. While the first electric train ran in Bombay in 1925 on DC traction, WCP-1 class electric locomotives were introduced in 1928, capable of speeds of up to 137 km/h (85 mph), though trains operated at lower speed. WDM-1, the first diesel locomotive introduced in 1957 was capable of speeds of up to 104 km/h (65 mph). In 1957, Indian Railways adopted 25 kV 50 Hz AC traction with the first runs beginning in December 1959 with the WAM-1 locomotives, capable of reaching speeds of up to 112 km/h (70 mph).

In 1960, the Railway Board of India commissioned a study to increase the speed of its trains, which was restricted to 96 km/h (60 mph) on the existent broad gauge lines. A target of 160 km/h (100 mph) with an intermediate stage of 120 km/h (75 mph) was set for passenger trains. Research Design and Standards Organisation (RDSO) started work on the same in 1962 with field trials commencing in 1967. The coaches were manufactured by the Integral Coach Factory at Madras and hauled by diesel locomotives. On 19 February 1969, the Government of India announced the introduction of a new express train capable of reaching speeds of up to 120 km/h (75 mph) in the railway budget. On 1 March 1969, the first Rajdhani Express was flagged off from New Delhi to Howrah, which reached a maximum speed of 120 km/h (75 mph) and completed the 1,450 km (900 mi) trip in 17 hours 20 minutes at an average speed of 84 km/h (52 mph).

In 1980, the WAP-1 electric locomotives reached a speed of 130 km/h (81 mph). Shatabdi Express introduced in 1988, were capable of running at a maximum speed of 130 km/h (81 mph). WAP-5 class locomotives, initially imported from ABB in 1995 and later manufactured at Chittaranjan Locomotive Works in India, reached 184 km/h (114 mph) in trials. The locomotive later set an Indian speed record by hauling a train between Delhi and Agra at a speed of 160 km/h (100 mph) in 2014. In December 2009, the Ministry of Railways of Government of India envisaged the implementation of regional high-speed rail projects to provide services at 250–350 km/h (160–220 mph), and planning for corridors connecting commercial, tourist, and pilgrimage hubs. On 25 July 2013, Government of India established the High Speed Rail Corporation under Rail Vikas Nigam (RVNL) for the implementation of high-speed rail corridor projects. In 2014, the Diamond Quadrilateral high speed rail project, which would connect the cities of Chennai, Delhi, Kolkata and Mumbai via high-speed rail was approved by the government.

In April 2016, the WAP-5 hauled Gatimaan Express became the fastest commercial train in India, with a maximum operational speed of 160 km/h (100 mph). In 2018, a modified WAP-5A locomotive, capable of speeds up to 200 km/h (125 mph) was rolled out. HSRC was renamed as National High Speed Rail Corporation (NHSRC) in 2016. NHSRC identified eight corridors for the development of high speed railway. Construction of the Mumbai–Ahmedabad high-speed rail corridor, India's first high-speed rail corridor started in 2021 and is expected to be operational by 2028.

In 2018, Integral Coach Factory in Chennai, rolled out a semi-high-speed EMU train-set, capable of reaching 180 km/h (112 mph). In 2019, the first Vande Bharat Express entered commercial service with a maximum operational speed of 160 km/h (100 mph). The actual operating speed was much lower due to track restrictions and congestion with top speeds restricted to 130 km/h (81 mph) for most trains. In October 2023, Namo Bharat, built for RapidX by Alstom was launched and is capable of reaching speeds of up to 180 km/h (112 mph). In December 2023, two modified WAP-5 locomotives were used to haul the Amrit Bharat train-set in a push-pull configuration, capable of reaching speeds of up to 160 km/h (100 mph).

In June 2024, the Indian Government announced that rather than purchase the now legacy E5 Series Shinkansen sets, contracted, in 2016, for the Mumbai-Ahmedabad High-Speed Rail corridor, its own, government owned, Integral Coach Factory and BEML, would produce a pair of standard gauge trains, capable of a maximum operational speed of 250 km/h (160 mph), for the line. The first prototype is expected to be delivered in December 2026.

In April 2025, it was reported that Japan will gift India two retired engineering train sets, one, 2011, E5 - (Doctor Yellow), and the, 2001, E3 - Class E926 Shinkansen, to help test and inspect the under-construction Mumbai-Ahmedabad High-Speed Rail corridor. The two train sets are to be delivered in 2026, to aid the 2027-2028 commissioning of the line. The gifted Doctor Yellow will have a maximum operational speed of 285 km/h (177 mph). It was also reported that the Indian Government has a desire to purchase E10 Series Shinkansen for the corridor.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in India