Compared to conventional railways, maglev trains can have higher top speeds, superior acceleration and deceleration, lower maintenance costs, improved gradient handling, and lower noise. However, they are more expensive to build, cannot use existing infrastructure, and use more energy at high speeds.

Maglev trains have set several speed records. The train speed record of 603 km/h (375 mph) was set by the experimental Japanese L0 Series maglev in 2015. From 2002 until 2021, the record for the highest operational speed of a passenger train of 431 kilometres per hour (268 mph) was held by the Shanghai maglev train, which uses German Transrapid technology. The service connects Shanghai Pudong International Airport and the outskirts of central Pudong, Shanghai. At its historical top speed, it covered the distance of 30.5 kilometres (19 mi) in just 7 minutes and 20 seconds.

Different maglev systems achieve levitation in different ways, which broadly fall into two categories: electromagnetic suspension (EMS) and electrodynamic suspension (EDS). Propulsion is typically provided by a linear motor. The power needed for levitation is typically not a large percentage of the overall energy consumption of a high-speed maglev system. Instead, overcoming drag takes the most energy. Vactrain technology has been proposed as a means to overcome this limitation.

Despite over a century of research and development, there are only six operational maglev trains today — four in China, one in Japan, and one in South Korea.

Two inter-city maglev lines are currently under construction, the Chūō Shinkansen connecting Tokyo and Nagoya (with further connection to Osaka) and a line between Changsha and Liuyang in Hunan Province, China.

History

Development

In the late 1940s, the British electrical engineer Eric Laithwaite, a professor at Manchester University, developed the first full-size working model of the linear induction motor. He became a professor of heavy electrical engineering at Imperial College London in 1964, where he continued his successful development of the linear motor. Since linear motors do not require physical contact between the vehicle and guideway, they became a common fixture on advanced transportation systems in the 1960s and 1970s. Laithwaite joined one such project, the Tracked Hovercraft RTV-31, based near Cambridge, UK, although the project was canceled in 1973.

The linear motor was naturally suited to use with maglev systems as well. In the early 1970s, Laithwaite discovered a new arrangement of magnets, the magnetic river, that allowed a single linear motor to produce both lift and forward thrust, allowing a maglev system to be built with a single set of magnets. Working at the British Rail Research Division in Derby, along with teams at several civil engineering firms, the "transverse-flux" system was developed into a working system.

The first commercial maglev people mover was simply called "MAGLEV" and officially opened in 1984 near Birmingham, England. It operated on an elevated 600 metres (2,000 ft) section of monorail track between Birmingham Airport and Birmingham International railway station, running at speeds up to 42 kilometres per hour (26 mph). The system was closed in 1995 due to reliability problems.

First maglev patent

High-speed transportation patents were granted to various inventors throughout the world. The first relevant patent, U.S. patent 714,851 (2 December 1902), issued to Albert C. Albertson, used magnetic levitation to take part of the weight off of the wheels while using conventional propulsion.

Early United States patents for a linear motor propelled train were awarded to German inventor Alfred Zehden. The inventor was awarded U.S. patent 782,312 (14 February 1905) and U.S. patent RE12700 (21 August 1907). In 1907, another early electromagnetic transportation system was developed by F. S. Smith. In 1908, Cleveland mayor Tom L. Johnson filed a patent for a wheel-less "high-speed railway" levitated by an induced magnetic field. Jokingly known as "Greased Lightning," the suspended car operated on a 90-foot test track in Johnson's basement "absolutely noiseless[ly] and without the least vibration." A series of German patents for magnetic levitation trains propelled by linear motors were awarded to Hermann Kemper between 1937 and 1941. An early maglev train was described in U.S. patent 3,158,765, "Magnetic system of transportation", by G. R. Polgreen on 25 August 1959. The first use of "maglev" in a United States patent was in "Magnetic levitation guidance system" by Canadian Patents and Development Limited.

New York, United States, 1912

In 1912, French-American inventor Émile Bachelet demonstrated a model train with electromagnetic levitation and propulsion in Mount Vernon, New York. Bachelet's first related patent, U.S. patent 1,020,942 was granted in 1912. The electromagnetic propulsion was by attraction of iron in the train by direct current solenoids spaced along the track. The electromagnetic levitation was due to the repulsion between the train's aluminum base plate and the pulsating-current electromagnets beneath the track. The pulses were generated by Bachelet's own Synchronizing-interrupter U.S. patent 986,039 supplied with 220 VAC. As the train moved, it switched power to the section of track that it was on. Bachelet went on to demonstrate his model in London, England in 1914, which resulted in the registration of Bachelet Levitated Railway Syndicate Limited July 9 in London, just weeks before the start of WWI.

Bachelet's second related patent, U.S. patent 1,020,943, granted the same day as the first, featured levitation electromagnets in the train, with the track as an aluminum plate. In the patent, he stated that this was a much cheaper construction, but he did not demonstrate it.

Japan, 1962–present

Japan has two technologically distinct maglev systems developed independently: one is the superconducting maglev (SCMaglev), whose development began in the 1960s, and the other is HSST, whose development began in the 1970s. The former is being constructed as the Chūō Shinkansen, a line linking Tokyo (Shinagawa Station) and Nagoya over a distance of 285.6 kilometres (177.5 mi), while the latter entered operation in 2005 as the Linimo, operating over an 8.9 kilometres (5.5 mi) route in Aichi Prefecture.

The development of the former started in 1962. The first successful SCMaglev run was conducted on a short track at the Japanese National Railways (JNR) Railway Technical Research Institute in 1972. Maglev trains on the Miyazaki test track (a later, 7 km long test track) regularly hit 517 kilometres per hour (321 mph) by 1979. After an accident destroyed the train, a new design was selected. In Okazaki, Japan (1987), the SCMaglev was used for test rides at the Okazaki exhibition. Tests in Miyazaki continued throughout the 1980s, before transferring to a far longer test track, 20 kilometres (12 mi) long, in Yamanashi in 1997. The track has since been extended to almost 43 kilometres (27 mi). The 603 kilometres per hour (375 mph) world speed record for crewed trains was set there in 2015.

Construction of the Chūō Shinkansen, which employs SCMaglev technology, began in 2014. Initially, the section between Tokyo (Shinagawa Station) and Nagoya was scheduled to open in 2027, with the extension to Osaka planned for the 2030s. However, due to construction delays and opposition from Heita Kawakatsu, the governor of Shizuoka Prefecture, through which the line passes, the opening of the Tokyo–Nagoya section is, as of 2026, expected no earlier than 2036.

Development of HSST started in 1974. In 1978, it successfully achieved unmanned operation at a speed of 308 km/h. In Tsukuba, Japan (1985), the HSST-03 became popular at the Tsukuba World Exposition, in spite of its low 30 kilometres per hour (19 mph) top speed. In the 1989 experimental line project using the Class 100S vehicles, the technology was assessed by the Ministry of Transport and academic experts as having reached the stage of practical application. Subsequently, the lower-cost Class 100L was developed, and based on this vehicle, the Linimo was constructed. The Linimo opened in 2005 for the Expo 2005 and has since operated as a local public transport system, with a maximum speed of 100 kilometres per hour (62 mph).

New York, United States, 1967

In 1961, while stuck in traffic, Brookhaven National Laboratory (BNL) researcher James Powell thought of using mangetic levtitation technology to solve the congestion. Powell and BNL colleague Gordon Danby worked in their spare time to develop a maglev concept using static magnets mounted on a moving vehicle to induce electrodynamic lifting and stabilising forces in specially shaped loops. They applied for a patent for their system in 1967, which was granted in 1969.

Hamburg, Germany, 1979

Transrapid 05 was the first maglev train with long-stator propulsion licensed for passenger transportation. In 1979, a 908 metres (2,979 ft) track was opened in Hamburg for the first International Transportation Exhibition (IVA 79). Interest was so strong that operations were extended for three months after the exhibition finished, during which more than 50,000 passengers were carried. The Transrapid 05 was reassembled in Kassel in 1980.

Ramenskoye, Moscow, USSR, 1979

In 1979, the USSR town of Ramenskoye (Moscow oblast) built an experimental test site for running experiments with cars on magnetic suspension. The test site consisted of a 60-metre ramp, which was later extended to 980 metres. From the late 1970s to the 1980s five prototypes of cars were built that received designations from TP-01 (ТП-01) to TP-05 (ТП-05). The early cars were supposed to reach the speed up to 100 kilometres per hour (62 mph).

The construction of a maglev track using the technology from Ramenskoye started in Armenian SSR in 1987 and was planned to be completed in 1991. The track was supposed to connect the cities of Yerevan and Sevan via the city of Abovyan. The original design speed was 250 kilometres per hour (160 mph) which was later lowered to 180 kilometres per hour (110 mph). However, the Spitak earthquake in 1988 and the First Nagorno-Karabakh War caused the project to freeze. In the end, the overpass was only partially constructed.

In the early 1990s, the maglev theme was continued by the Engineering Research Center "TEMP" (ИНЦ "ТЭМП") this time by the order from the Moscow government. The project was named V250 (В250). The idea was to build a high-speed maglev train to connect Moscow to the Sheremetyevo airport. The train would consist of 64-seater cars and run at speeds up to 250 kilometres per hour (160 mph). In 1993, due to the financial crisis, the project was abandoned. However, since 1999, the "TEMP" research center has been participating as a co-developer in developing the linear motors for the Moscow Monorail system.

Birmingham, United Kingdom, 1984–1995

The world's first commercial maglev system was a low-speed maglev shuttle that ran between the airport terminal of Birmingham Airport and the nearby Birmingham International railway station between 1984 and 1995. Its track length was 600 metres (2,000 ft); trains levitated at an altitude of 15 millimetres [0.59 in], levitated by electromagnets, and propelled with linear induction motors. It operated for 11 years and was initially very popular with passengers, but obsolescence problems with the electronic systems made it progressively unreliable as years passed, leading to its closure in 1995. One of the original cars is now on display at Railworld in Peterborough, together with the RTV31 hover train vehicle. Another is on display at Locomotion Museum in Shildon, County Durham.

Several favorable conditions existed when the link was built:

  • The British Rail Research vehicle was 3 tonnes, and the extension to the 8-tonne vehicle was easy.
  • Electrical power was available.
  • The airport and rail buildings were suitable for terminal platforms.
  • Only one crossing over a public road was required, and no steep gradients were involved.
  • Land was owned by the railway or airport.
  • Local industries and councils were supportive.
  • Some government finance was provided, and because of shared work, the cost per organization was low.

After the system closed in 1995, the original guideway lay dormant until 2003, when a replacement cable-hauled system, the AirRail Link Cable Liner people mover, was opened.

Emsland, Germany, 1984–2011

Transrapid, a German maglev company, had a test track in Emsland totaling 31.5 kilometres (19.6 mi). The single-track line ran between Dörpen and Lathen with turning loops at each end. The trains regularly ran at up to 420 kilometres per hour (260 mph). Paying passengers were carried as part of the testing process. The construction of the test facility began in 1980 and finished in 1984.

In 2006, a maglev train accident occurred in Lathen, killing 23 people. It was found to have been caused by human error in the implementation of safety checks. From 2006, no passengers were carried. At the end of 2011, the operating license expired and was not renewed; in early 2012, demolition permission was granted for its facilities, including the track and factory.

In March 2021, it was reported that the CRRC was investigating the revival of the Emsland test track. In May 2019, CRRC had unveiled its "CRRC 600" prototype, which is designed to reach 600 kilometres per hour (370 mph).

Vancouver, Canada, and Hamburg, Germany, 1986–1988

In Vancouver, Canada, the HSST-03 by HSST Development Corporation (Japan Airlines and Sumitomo Corporation) was exhibited at Expo 86, and ran on a 400-metre (0.25 mi) test track that provided guests with a ride in a single car along a short section of track at the fairgrounds. It was removed after the fair. It was shown at the Aoi Expo in 1987 and is now on static display at Okazaki Minami Park.

South Korea, 1993–2022, 2025–present

In 1993, South Korea completed the development of its own maglev train, shown off at the Daejeon Expo '93, which was developed further into a full-fledged maglev UTM-02 capable of traveling up to 110 kilometres per hour (68 mph) in 2006. This final model was incorporated in the Incheon Airport Maglev which opened on 3 February 2016, making South Korea the world's fourth country to operate its own self-developed maglev after the United Kingdom's Birmingham International Airport, Germany's Berlin M-Bahn, and Japan's Linimo. It links Incheon International Airport to the Yongyu Station and Leisure Complex on Yeongjong island. It offers a transfer to the Seoul Metropolitan Subway at AREX's Incheon International Airport Station and is offered free of charge to anyone to ride, operating between 9 am and 6 pm with 15-minute intervals.

The maglev system was co-developed by the South Korea Institute of Machinery and Materials (KIMM) and Hyundai Rotem. It is 6.1 kilometres (3.8 mi) long, with six stations and a 110 kilometres per hour (68 mph) operating speed.

Two more stages are planned of 9.7 kilometres (6 mi) and 37.4 kilometres (23.2 mi). Once completed, it will become a circular line.

The line was shut down in July 2022. It reopened "as a tourism and experiential facility rather than a public transportation service" in October 2025.

Brazil 2009–present

Maglev Cobra is a maglev system under development at the Federal University of Rio de Janeiro in Brazil. The prototype was unveiled in 2009.

Germany/China, 2010–present

Transport System Bögl (TSB) is a driverless maglev system developed by the German construction company Max Bögl since 2010. Its primary intended use is for short- to medium-distance travel (up to 30 km) and speeds up to 150 km/h, for uses such as airport shuttles. The company has been conducting test runs on an 820-metre-long test track at its headquarters in Sengenthal, Upper Palatinate, Germany, since 2012, clocking over 100,000 tests covering over 65,000 km as of 2018.

In 2018, Max Bögl entered into a joint venture with the Chinese company Chengdu Xinzhu Road & Bridge Machinery Co., granting the Chinese partner exclusive rights to production and marketing of the system in China. The joint venture constructed a 3.5 km (2.2 mi) demonstration line near Chengdu, China, and two vehicles were airlifted there in June, 2020. In February 2021 a vehicle on the Chinese test track hit a top speed of 169 km/h (105 mph).

China, since 2000

According to the International Maglev Board there are at least four maglev research programmes underway in China at:

  • Southwest Jiaotong University (Chengdu)
  • Tongji University (Shanghai)
  • CRRC Tangshan-Changchun Railway Vehicle Co.
  • Chengdu Aircraft Industry Group.

The latest high-speed prototype, unveiled in July 2021, was manufactured by CRRC Qingdao Sifang.

Low-to-medium speed

Development of the low-to-medium speed systems, that is, 100–200 km/h (62–124 mph), by the CRRC has led to opening lines such as the Changsha Maglev Express in 2016 and the Line S1 in Beijing in 2017. In April 2020, a new model capable of 160 km/h (99 mph) and compatible with the Changsha line completed testing. The vehicle, under development since 2018, has a 30 percent increase in traction efficiency and a 60 percent increase in speed over the stock in use on the line. The vehicles entered service in July 2021 with a top speed of 140 km/h (87 mph). CRRC Zhuzhou Locomotive said in April 2020 that it is developing a model capable of 200 km/h (120 mph).

High speed

There are two competing efforts for high-speed maglev systems, i.e., 300–620 km/h (190–390 mph).

  • The first is based on the Transrapid technology used in the Shanghai maglev train and is developed by the CRRC under license from Thyssen-Krupp.
    • In 2006 the 500 km/h (310 mph) CM1 Dolphin prototype was unveiled and began testing on a new 1.5-kilometre (0.93 mi) test track at Tongji University, northwest of Shanghai.
    • A prototype vehicle of the 600 km/h (370 mph) CRRC 600 was developed in 2019 and tested from June 2020.
    • In March 2021 a 300 km/h (190 mph) model began trials.
    • In July 2021, the CRRC 600 maglev, planned to travel at up to 600 km/h (370 mph), was unveiled in Qingdao.
    • A high-speed test track is under development in China, and in April 2021, consideration was given to reopening the Emsland test facility in Germany.
  • A second, incompatible high-speed prototype was constructed by Max Bögl and Chengdu Xinzhu Road & Bridge Machinery Co. Ltd. and unveiled in January 2021. Developed at Southwest Jiaotong University in Chengdu, the Super Bullet Maglev design uses high-temperature superconducting magnets and has a proposed top speed of 620 km/h (390 mph). However, at the time of its unveiling, testing was limited to low-speed runs on a 165-metre (180 yd) test track using a full-scale model.

Sign in to keep reading

6 more chapters are free with a Lably account.

More in Transportation