Lably
Skip to content

India's three-stage nuclear power programme

India's nuclear energy programme envisioned by Homi J. Bhabha

  • 20 min read
  • 8 chapters
Monazite Thorium is a silvery radioactive, metallic element. The primary source of the world's thorium is the rare-earth-and-thorium-phosphate mineral monazite . Monazite is not recovered as a salable
Chris 73 · Public domain

Related on Lably

Through Energy independence, South India and Nuclear fission

Thorium is particularly attractive for India, as India has only around 1–2% of the global uranium reserves, but one of the largest shares of global thorium reserves at about 25% of the world's known thorium reserves. However, thorium is more difficult to use than uranium as a fuel because it requires breeding, and global uranium prices remain low enough that breeding is not cost effective.

India published about twice the number of papers on thorium as its nearest competitors, during each of the years from 2002 to 2006. The Indian nuclear establishment estimates that the country could produce 500 GWe for at least four centuries using just the country's economically extractable thorium reserves.

The first Prototype Fast Breeder Reactor has been repeatedly delayed – and was commissioned in March 2024 – and India continues to import thousands of tonnes of uranium from Russia, Kazakhstan, France, and Uzbekistan. The 2005 Indo–US Nuclear Deal and the NSG waiver, which ended more than three decades of international isolation of the Indian civil nuclear programme, have created many hitherto unexplored alternatives for the success of the three-stage nuclear power programme.

Origin and rationale

Homi Bhabha conceived of the three-stage nuclear programme as a way to develop nuclear energy by working around India's limited uranium resources. Thorium itself is not a fissile material, and thus cannot undergo fission to produce energy. Instead, it must be transmuted to uranium-233 in a reactor fueled by other fissile materials. The first two stages, natural uranium-fueled heavy water reactors and plutonium-fueled fast breeder reactors, are intended to generate sufficient fissile material from India's limited uranium resources, so that all its vast thorium reserves can be fully utilised in the third stage of thermal breeder reactors.

Bhabha summarised the rationale for the three-stage approach as follows:

The total reserves of thorium in India amount to over 500,000 tons in the readily extractable form, while the known reserves of uranium are less than a tenth of this. The aim of long range atomic power programme in India must therefore be to base the nuclear power generation as soon as possible on thorium rather than uranium… The first generation of atomic power stations based on natural uranium can only be used to start off an atomic power programme… The plutonium produced by the first generation power stations can be used in a second generation of power stations designed to produce electric power and convert thorium into U-233, or depleted uranium into more plutonium with breeding gain… The second generation of power stations may be regarded as an intermediate step for the breeder power stations of the third generation all of which would produce more U-233 than they burn in the course of producing power.

In November 1954, Bhabha presented the three-stage plan for national development at the conference on "Development of Atomic Energy for Peaceful Purposes" which was also attended by India's first Prime Minister Jawaharlal Nehru. Four years later, the Indian government formally adopted the three-stage plan. Indian energy resource base was estimated to be capable of yielding a total electric power output of the order shown in the table below. Indian government recognised that thorium was a source that could provide power to the Indian people for the long term.

Sign in to keep reading

7 more chapters are free with a Lably account.

More in Energy