Péligre Dam

Dam in Centre, Haiti

  • 11 min read
  • 5 chapters

Related on Lably

Through Erosion, Deforestation and Agriculture

Despite its purpose of providing energy throughout Haiti, many contend that the energy provided by the dam is not distributed equitably. Furthermore, the dam has had significant environmental, social, and health consequences on the local people, who were forced to relocate as a result of the dam's completion. These are points of concern to academics, journalists, and human rights activists who, noting heavy North American involvement in the planning and construction of the dam, believe that neoliberal influences may be at play.

Background

Geography

The Péligre dam is in the Artibonite watershed, the largest hydrographic basin in Haiti.

Composition and dimensions

The power plant contains three 17 MW Francis turbine-generators for an installed capacity of 51 MW.

Initial building and purpose

The Péligre Dam was proposed as a means to rehabilitate the agricultural lands of the Central Plateau through control of floods as well as to generate hydroelectricity to fuel the industrial expansion of Haiti. The Artibonite would become the first source of hydroelectric power and irrigation water in that nation. The dam was popularized throughout the country as a mechanism for increased crop yields via controlled irrigation. Rice grown for export, in particular, was the target of this irrigation intervention. Also, it was believed that the generation of a reliable supply of electricity from the dam would drive economic growth and reduce social disparity.

Planning and construction of the dam was heavily influenced by the United States of America. The dam was nicknamed the “Little TVA” after the Tennessee Valley Authority, because of its purpose of providing energy for all of Haiti. The dam was designed by the United States Army Corps of Engineers. It was funded by the Export Import Bank of the United States. Construction on the dam was overseen by engineer André A. Loiselle. The dam was completed in 1956 by the US Army Corps of Engineers and Brown & Root, creating Lake Péligre (essentially a large reservoir) in the process.