Lably
Skip to content

SkyTrain (Vancouver)

Rapid transit system in British Columbia

  • 33 min read
  • 6 chapters

Explore on Lably

ToursExplore Lably’s 3D tours

The name "SkyTrain" was coined for the system during Expo 86 because the first line (Expo) principally runs on elevated guideway outside of Downtown Vancouver, providing panoramic views of the metropolitan area. SkyTrain uses the world's third-longest cable-supported transit-only bridge, known as SkyBridge, to cross the Fraser River.

With the opening of the Evergreen Extension on December 2, 2016, SkyTrain became the longest rapid transit system in Canada and the longest fully automated driverless system in the world. The total lengths of the automated lines of the Shanghai Metro, Singapore MRT, Kuala Lumpur Rapid KL, Dubai Metro and Riyadh Metro have since surpassed those of SkyTrain.

SkyTrain has 54 stations served by three lines: the Expo Line, the Millennium Line, and the Canada Line. The Expo and Millennium Lines are operated by British Columbia Rapid Transit Company under contract from TransLink (originally BC Transit), a regional government transportation agency. The Canada Line is operated on the same principles by the private concessionaire ProTrans BC under contract to TransLink and is an integrated part of the regional transport system. SkyTrain uses a fare system shared with other local transit services and is policed by the Metro Vancouver Transit Police who can enforce fares and write infraction tickets. SkyTrain attendants (STAs) provide first aid, emergency response, directions and customer service, monitor train faults, and operate the trains manually if necessary.

Network

Expo Line

The Expo Line connects Waterfront station in Vancouver to King George station in Surrey, principally along a route established by the Westminster and Vancouver Tramway Company as an interurban line in 1890. The Expo Line (originally referred to as simply "SkyTrain" until the opening of the Millennium Line) was built in 1985 in time for Expo 86. It now has 24 stations. The Expo Line ran only as far as New Westminster station initially. In 1989, it was extended to Columbia station and in 1990, once the SkyBridge was finished, it continued across the Fraser River to Scott Road station in Surrey. In 1994, the terminus of the Expo Line became King George station in central Surrey. It was built on a budget of $854 million (1986 dollars). Effective October 22, 2016, Expo Line trains began operating on a new branch to Production Way–University station, taking over the previous Millennium Line service between Waterfront and that station. During peak periods, trains between Waterfront and Columbia arrive every 2 to 3 minutes. Between Waterfront and King George, trains arrive every 2 to 5 minutes during peak hours, while trains between Waterfront and Production Way arrive every 6 to 7 minutes in the peak hours.

Millennium Line

Prior to October 22, 2016, the Millennium Line shared tracks with the Expo Line from Waterfront station to Columbia station in New Westminster, then continued along its own elevated route through North Burnaby and East Vancouver, ending at VCC–Clark station, near Vancouver Community College's Broadway campus. It was built on a $1.2-billion budget and the final extension from Commercial Drive station (now Commercial–Broadway station) to VCC–Clark station was opened on January 6, 2006. From October 22, 2016, to December 1, 2016, the Millennium Line operated from VCC–Clark to Lougheed Town Centre station. As of December 2, 2016, the Millennium Line operates between VCC–Clark station in Vancouver and Lafarge Lake–Douglas station in Coquitlam. The Millennium Line has 17 stations, three of which are transfer stations with the Expo Line (Commercial–Broadway, Production Way–University, and Lougheed Town Centre) and two which connect with the West Coast Express commuter train (Moody Centre and Coquitlam Central). The original Millennium Line's stations were designed by British Columbia's top architects and are unlike those on the Expo Line. In 2004, Busby and Associates Architects, designers of the Brentwood Town Centre station in Burnaby, were honoured for their work with a Governor General's Medal in Architecture.

Construction on the Millennium Line's Evergreen Extension, from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Coquitlam, was completed in 2016 and it was opened for revenue service on December 2, 2016. This extension adds 11 km (6.8 mi) and 6 new stations to the Millennium Line.

Canada Line

The Canada Line begins at the Waterfront station hub, then continues south through Vancouver into the City of Richmond and Sea Island. From Bridgeport station, the Canada Line splits into two branches, one heading west to the YVR–Airport station at Vancouver International Airport and the other continuing south to the Richmond–Brighouse station in Richmond's city centre. Opened on August 17, 2009, the Canada Line added 15 stations and 19.2 km (11.9 mi) to the SkyTrain network. Waterfront station is the only station where the Canada Line directly connects with the Expo Line; however, Vancouver City Centre station is within a three-minute walk from Granville station via the Pacific Centre mall, making an unofficial transfer to the Expo Line. The Canada Line cost $1.9 billion, financed by the Governments of Canada and British Columbia, TransLink, and InTransitBC. The Canada Line's trains, built by Hyundai Rotem, are fully automated, but are of a different design from the Expo and Millennium Lines' Bombardier-built fleet. They use conventional electric motors rather than linear induction motor technology. Canada Line tracks do not interconnect with the rest of the SkyTrain network, and there is a separate fleet maintenance depot.

Sign in to keep reading

5 more chapters are free with a Lably account.

More in Transportation