Toronto subway

Rapid transit system in Ontario, Canada

  • 39 min read
  • 12 chapters
A Finch-bound Toronto Rocket Line 1 Subway train at Union station
Dillan Payne · CC BY-SA 4.0

Related on Lably

Through London Underground, COVID-19 pandemic and Wi-Fi

In 1954, the TTC opened Canada's first subway line, then known as the "Yonge subway" and now part of Line 1, under Yonge Street between Union Station and Eglinton Avenue with 12 stations. As of 2026, the network encompasses 109 stations and 99.4 kilometres (61.8 mi) of route. In 2025, the system had a ridership of 331,789,000, or about 1,087,000 per weekday as of the second quarter of 2026, making it the busiest rapid transit system in Canada in terms of daily ridership. As of May 2026, there are 26 stations under construction as part of the Ontario Line and three extensions to existing lines.

Lines

The lines of the Toronto subway system are known by both a number and a name. While each line is also assigned a colour, the colours are used only to visually distinguish them on maps and signage, not as names.

There are five operating rapid transit lines in Toronto:

  • Line 1 Yonge–University
  • Line 2 Bloor–Danforth
  • Line 4 Sheppard
  • Line 5 Eglinton
  • Line 6 Finch West

One additional line is also under construction:

  • Ontario Line

Line 1 Yonge–University is the longest and busiest rapid transit line in the system. It opened as the Yonge subway in 1954 with a length of 7.4 kilometres (4.6 mi) and since then has grown to a length of 38.8 kilometres (24.1 mi). The modern line is U-shaped, having two northern terminals – at Vaughan Metropolitan Centre and Finch – and its southern end at Union station in downtown Toronto. As of February 2026, an extension of Line 1 northwards to Richmond Hill is being procured, with five new stations and a planned opening date in the 2030s.

Line 2 Bloor–Danforth, opened in 1966, runs parallel to Bloor Street and Danforth Avenue between Kipling station in Etobicoke and Kennedy station in Scarborough. Construction on a three-stop extension of Line 2 northeastward from Kennedy station to Sheppard Avenue and McCowan via Scarborough City Centre began in 2021, with a planned opening date in the 2030s.

Line 4 Sheppard, opened in 2002, runs eastward under Sheppard Avenue East from Sheppard–Yonge station on Line 1 to Don Mills station; it is the shortest rapid transit line in Toronto at a length of 5.5 kilometres (3.4 mi) and the only one without any open sections.

Line 5 Eglinton is a 19-kilometre (12 mi) light rail line along Eglinton Avenue, running from Kennedy station in the east to Mount Dennis station in the west. The line has 25 stopping points, 15 of which are underground stations, with the remaining 10 being at-grade stops located in the road's median. Construction began in 2011, with completion of the project delayed several times. The line opened on February 8, 2026, at a cost of approximately $12 billion. An extension of Line 5 westwards for 9.2 kilometres (5.7 mi) to Renforth station is also under construction. The extension will have seven stations, four underground and two elevated. Construction began in 2022 and is scheduled for completion in the 2030s.

Line 6 Finch West, opened in 2025, runs westward at-grade in the median of Finch Avenue for 11 kilometres (6.8 mi) and 18 stops from Finch West station on Line 1 to Humber College station. It was the first light rail line to enter service as part of the rapid transit system; construction began in 2019, and the line opened on December 7, 2025.

As of February 2026, one new line is under construction:

  • The Ontario Line will be a 15.6-kilometre (9.7 mi) underground rapid transit line from Exhibition station to Don Valley station that will provide the first east–west rapid transit line through the Financial District and the central downtown core. The project evolved from the long-planned Downtown Relief Line, first proposed in the mid-1980s. The line is scheduled for completion in 2031 at a cost of $17 to $19 billion. Upon opening, the plan is to reassign the "Line 3" moniker formerly used by Line 3 Scarborough to the Ontario Line.

Until July 2023, the TTC operated an elevated light metro service. Line 3 Scarborough, originally known as the Scarborough RT, was an elevated medium-capacity (light metro) rail line serving the city's eponymous suburban district. It opened in 1985, running from Kennedy station to McCowan station via Scarborough Centre. It was the only rapid transit line in Toronto to use the Intermediate Capacity Transit System (ICTS) technology. Because of maintenance difficulties (along with the Line 2 subway extension into Scarborough), Line 3 was to be decommissioned on November 19, 2023. However, it was decommissioned approximately four months early due to a derailment on July 24, 2023. Bus service replaced Line 3 and is scheduled to continue until the extension of Line 2 to McCowan Road and Sheppard Avenue via Scarborough City Centre opens in 2030.