Montreal Metro

Metro system in Montreal, Quebec

  • 36 min read
  • 8 chapters
Photos of the Montreal metro. 1. (upper left) Square-Victoria-OACI station: An entrance styled after the Paris metro entrances originally designed by Hector Guimard. 2. (upper right) Interior of a MPM
Alexcaban · CC BY-SA 3.0

Related on Lably

Through Montreal, World War I and Great Depression

Since its opening, with 22 stations on two lines, it has expanded to 68 stations on four lines, totalling 69.2 kilometres (43.0 mi) in length. It serves the north, east and centre of the Island of Montreal, with connections to Longueuil via the Yellow Line (Line 4), and Laval via the Orange Line (Line 2).

The Montreal Metro is Canada's second busiest rapid transit system in terms of daily ridership, delivering an average of 1,003,800 daily unlinked passenger trips per weekday as of the second quarter of 2026. It is North America's fourth busiest rapid transit system, behind the New York City Subway, Mexico City Metro and Toronto subway. In 2025, 311,929,200 trips on the Metro were completed. It is one of two rapid transit systems in Montreal, alongside the Réseau express métropolitain (REM).

History

Urban transit began in Montreal in 1861 when a line of horse-drawn cars started to operate on Craig (now St-Antoine) and Notre-Dame streets. Eventually, as the city grew, a comprehensive network of streetcar lines provided service in most of the city. But urban congestion started to take its toll on streetcar punctuality, so the idea of an underground system was soon considered.

Fifty years of projects

In 1902, as European and American cities were inaugurating their first subway systems, the Canadian federal government created the Montreal Subway Company to promote the idea in Canada.

Starting in 1910, many proposals were tabled but the Montreal Metro would prove to be an elusive goal. The Montreal Street Railway Company, the Montreal Central Terminal Company and the Montreal Underground and Elevated Railway Company all undertook fruitless negotiations with the city. A year later, the Comptoir Financier Franco-Canadien and the Montreal Tunnel Company proposed tunnels under the city centre and the Saint-Lawrence River to link the emerging South Shore neighbourhoods but faced the opposition of railway companies. The Montreal Tramways Company (MTC) was the first to receive the approval of the provincial government in 1913 and four years to start construction. The reluctance of elected city officials to advance funds foiled this first attempt.

The issue of a subway remained present in the newspapers but World War I and the following recession prevented any execution. The gradual return to financial health during the 1920s brought the MTC project back and attracted support from the premier of Quebec. This new attempt was stalled by the Great Depression, which saw the city's streetcar ridership atrophy. A subway proposal was next made by Mayor Camillien Houde in 1939 as a way to provide work for the jobless masses.

World War II and the war effort in Montreal resurrected the idea of a metro. In 1944, the MTC proposed a two-line network, with one line running underneath Saint Catherine Street and the other under Saint Denis, Notre-Dame and Saint Jacques Streets. In 1951, the newly formed public Montreal Transportation Commission bought out the Montreal Tramways Company and started replacing streetcars with buses. The commission also proposed a single subway line reusing the 1944 plans and extending it all the way to Boulevard Crémazie, right by the D'Youville maintenance shops. By this point, construction was already well underway on Canada's first subway line in Toronto under Yonge Street, which would open in 1954. Still, Montreal councillors remained cautious and no work was initiated. For some of them, including Jean Drapeau during his first municipal term, public transit was a thing of the past.

In 1959, a private company, the Société d'expansion métropolitaine, offered to build a rubber-tired metro but the Transportation Commission wanted its own network and rejected the offer. This would be the last missed opportunity, for the re-election of Jean Drapeau as mayor and the arrival of his right-hand man, Lucien Saulnier, would prove decisive. In the early 1960s, the Western world experienced an economic boom and Quebec underwent its Quiet Revolution. From August 1, 1960, many municipal services reviewed the project and on November 3, 1961, the Montreal City Council voted appropriations amounting to $132 million ($1.06 billion in 2016) to construct and equip an initial network 16 kilometres (9.9 mi) in length.

Construction

The 1961 plan reused several previous studies and planned three lines carved into the rock under the city centre to the most populated areas of the city. The City of Montreal (and its chief engineer Lucien L'Allier) were assisted in the detailed design and engineering of the Metro by French consultant SOFRETU, owned by the operator of the Paris Métro. The French influence is clearly seen in the station design and rolling stock of the Metro. Rubber tires were chosen instead of steel ones, following the Parisian influence – as the rubber tired trains could use steeper grades and accelerate faster. 80% of the tunnels were built through rock, as opposed to the traditional cut-and-cover method used for the construction of the Yonge Subway in Toronto.

The first two lines

The main line, the Green Line or Line 1, was to pass between the two most important arteries, Saint Catherine and Sherbrooke streets, more or less under the De Maisonneuve Boulevard. It would extend between the English-speaking west at Atwater station and French-speaking east at Frontenac. The Orange Line (Line 2) was to run from north of the downtown, from Crémazie station through various residential neighbourhoods to the business district at Place-d'Armes station.

Construction of the first two lines began May 23, 1962, under the supervision of the Director of Public Works, Lucien L'Allier. On June 11, 1963, the construction costs for tunnels being lower than expected, the Orange Line was extended by two stations at each end and the new termini became the Henri-Bourassa and Bonaventure stations. The project, which employed more than 5,000 workers at its height, and cost the lives of 12 of them, ended on October 14, 1966. The service was opened gradually between October 1966 and April 1967 as the stations were completed.

Cancellation of the Red Line

A third line was planned. It was to use Canadian National Railway (CN) tracks passing under the Mount Royal to reach the northwest suburb of Cartierville from the city centre. Unlike the previous two lines, trains were to be partly running above ground. Negotiations with the CN and municipalities were stalling as Montreal was chosen in November 1962 to hold the 1967 Universal Exposition (Expo 67). Having to make a choice, the city decided that a Yellow Line (Line 4) linking Montreal to the South Shore suburbs following a plan similar to those proposed early in the 20th century was more necessary.

The Red Line (Line 3) was never built and the number was never used again. The railway, already used for a commuter train to the North Shore at Deux-Montagnes, was completely renovated in the early 1990s and effectively replaced the planned third line. The next line would thus be numbered 5 (Blue Line). Subsequently, elements of the line, particularly the Deux-Montagnes commuter train, became the first line of the Réseau Express Métropolitain.

Expo 67

The Montreal municipal administration asked municipalities of the South Shore of the Saint Lawrence River which would be interested in the Metro and Longueuil received the rail link. The Yellow Line (Line 4) would therefore pass under the river, from Berri-de-Montigny station, junction of the Green Line and the Orange Line, to Longueuil. A stop was added in between to access the site of Expo 67, built on two islands of the Hochelaga Archipelago in the river. Saint Helen's Island, on which the station of the same name was built, was massively enlarged and consolidated with several nearby islands (including Ronde Island) using backfill excavated during the construction of the Metro. Notre Dame Island, adjacent, was created from scratch with the same material. The Yellow Line was completed on April 1, 1967, in time for the opening of the World's Fair.

The first Metro network was completed with the public opening of the Yellow Line on April 28, 1967. The cities of Montreal, Longueuil and Westmount had assumed the entire cost of construction and equipment of $213.7 million ($1.6 billion in 2016). Montreal became the seventh city in North America to operate a subway. The 1960s being very optimistic years, Metro planning did not escape the general exuberance of the time, and a 1967 study, "Horizon 2000", imagined a network of 160 kilometres (99 mi) of tunnels for the year 2000.

Extensions and unbuilt lines

In 1970, the Montreal Urban Community (MUC) was created. This group was made of municipalities that occupy the Island of Montreal and the city of Montreal was the biggest participant. MUC's mission was to provide standardized services at a regional level, one of them being transportation. The MUC Transportation Commission was thus created at the same time to serve as prime contractor for the Metro extensions. It merged all island transport companies and became the Société de transport de la communauté urbaine de Montréal (STCUM) in 1985 and then the Société de transport de Montréal (STM) in 2002.

Montreal Olympics

The success of the Metro increased the pressure to extend the network to other populated areas, including the suburbs on the Island of Montreal. After being awarded, in May 1970, the 1976 Summer Olympics, a loan of $430 million ($2.7 billion in 2016) was approved by the MUC on February 12, 1971, to fund the extensions of the Green Line and the Orange Line and the construction of a transverse line: the Blue Line (Line 5). The Government of Quebec agreed to bear 60% of the costs.

The work on the extensions started October 14, 1971, with the Green Line towards the east to reach the site where the Olympic Stadium was to be built and Autoroute 25 (Honoré-Beaugrand station) that could serve as a transfer point for visitors arriving from outside. The extensions were an opportunity to make improvements to the network, such as new trains, larger stations and even semi-automatic control. The first extension was completed in June 1976 just before the Olympics. The Green Line was later extended to the southwest to reach the suburbs of Verdun and LaSalle with the Angrignon as the terminus station, named after the park and zoo. This segment opened at September 1978.

In the process, further extensions were planned and in 1975 spending was expected to reach reached $1.6 billion ($7.3 billion in 2016). Faced with these soaring costs, the Government of Quebec declared a moratorium May 19, 1976, to the all-out expansion desired by Mayor Jean Drapeau. Tenders were frozen, including those of the Orange Line after Snowdon station and those of the Blue Line, whose works were not yet already underway. A struggle then ensued between the MUC and the Government of Quebec as any extension could not be done without the agreement of both parties. The Montreal Transportation Office might have tried to put the government in front of a fait accompli by awarding large contracts to build the tunnel between Namur station and the Bois-Franc station just before the moratorium was in force.

Moratorium on expansion

In 1977, the newly elected government partially lifted the moratorium on the extension of the Orange line and the construction of the Blue Line. In 1978, the STCUM proposed a map which included a western extension of the Blue Line, with stations in Notre-Dame-de-Grâce, Montreal West, Ville St. Pierre, Lachine, LaSalle, and potentially beyond.

The Orange Line was gradually extended westward to Place-Saint-Henri station in 1980 and to Snowdon station in 1981. As the stations were completed, the service was extended. In December 1979 Quebec presented its "integrated transport plan" in which the Orange Line was to be tunnelled to Du Collège station and the Blue Line from Snowdon station to Anjou station. The plan proposed no other underground lines as the government preferred the option of converting existing railway lines to overground Metro ones. The mayors of the MUC, initially reluctant, accepted this plan when Quebec promised in February 1981 to finance future extensions fully. The moratorium was then modestly lifted on the Orange Line that reached Du Collège station in 1984 and finally Côte-Vertu station in 1986. This line took the shape of an "U" linking the north of the island to the city centre and serving two very populous axes.

The various moratoriums and technical difficulties encountered during the construction of the fourth line stretched the project over fourteen years. The Blue Line, which runs through the centre of the island of Montreal, crossed the east branch of the Orange Line at the Jean-Talon station in 1986 and its west branch at the Snowdon station in 1988. Because it was not crowded, the STCUM at first operated the Blue Line weekdays only from 5:30 am to 7:30 pm and was circulating only three-car trains instead of the nine car trains in use along the other lines. Students from the University of Montreal, the main source of customers, obtained extension of the closing time to 11:10 pm and then 0:15 am in 2002.

Recession and unfinished projects

In the late 1980s, the original network length had nearly quadrupled in twenty years and exceeded that of Toronto, but the plans did not stop there. In its 1983–1984 scenario, the MUC planned a new underground line, the White Line (Line 7) (Pie-IX station to Montréal-Nord) and several surface lines numbered Line 6 (Du College station to Repentigny), Line 8 (Radisson station to Pointe-aux-Trembles), Line 10 (Vendome station to Lachine) and Line 11 (Angrignon terminus to LaSalle). In 1985, a new government in Quebec rejected the project, replacing the Metro lines by commuter train lines in its own 1988 transport plan. Yet the provincial elections of 1989 approaching, the White Line project reappeared and the extensions of the Blue Line to Anjou (Pie-IX, Viau, Lacordaire, Langelier and Galeries d'Anjou) and the Orange Line northward (Deguire/Poirier, Bois-Franc and Salaberry) were announced.

At the beginning of the 1990s, there was a significant deficit in public finances across Canada, especially in Quebec, and an economic recession. Metro ridership decreased and the Government of Quebec removed subsidies for the operation of urban public transport. Faced with this situation, the extensions projects were put on hold and the MUC prioritized the renovation of its infrastructures.

Creation of AMT, RTM, ARTM, and improvements

In 1996, the Government of Quebec created a supra-municipal agency, the Agence métropolitaine de transport (AMT), whose mandate is to coordinate the development of transport throughout the Greater Montreal area. The AMT was responsible, among others, for the development of the Metro and suburban trains.

On June 1, 2017, the AMT was disbanded and replaced by two distinct agencies by the Loi 76 (English: Law 76), the Autorité régionale de transport métropolitain (ARTM), mandated to manage and integrate road transport and public transportation in Greater Montreal; and the Réseau de transport métropolitain (RTM, publicly known as exo), which took over all operations from the former Agence métropolitaine de transport. RTM now operates Montreal's commuter rail and metropolitan bus services, and is the second busiest such system in Canada after Toronto's GO Transit.

Laval extension

Announced in 1998 by the STCUM, the project to extend the Orange Line past the Henri-Bourassa terminus to the city of Laval, passing under the Rivière des Prairies, was launched March 18, 2002. The extension was decided and funded by the Government of Quebec. The AMT received the mandate of its implementation but the ownership and operation of the line stayed with the Société de transport de Montréal (STCUM successor). The work completed, opening to the public happened April 28, 2007. This extension added 5.2 kilometres (3.2 mi) to the network and three stations in Laval (Cartier, De la Concorde and Montmorency). As of 2009, ridership increased by 60,000 a day with these new stations.

Major renovations

Since 2004, most of the STM's investments have been directed to rolling stock and infrastructure renovation programs. New trains (MPM-10) have been delivered, replacing the older MR-63 trains. Tunnels are being repaired and several stations, including Berri–UQAM, have been several years in rehabilitation. In 2016, many electrical and ventilation structures on the surface were completely rebuilt to modern standards. In 2020, work to install cellular coverage in the Metro was completed. Station accessibility has also been improved, with over 30 of the 68 stations having elevators installed since 2007.

Réseau express métropolitain

In August 2023, the first phase of the Réseau express métropolitain (REM) opened between Gare Centrale (Bonaventure) and Brossard. The system is independent of, but connects to and hence complements the Metro. Built by CDPQ Infra, part of the Quebec pension fund Caisse de dépôt et placement du Québec. In November 2025, the second phase of the REM opened between Deux-Montagnes and Gare Centrale. The opening of the new branch introduced 2 new interchanges at Metro stations McGill and Édouard-Montpetit with an Exo interchange at the Côte-de-Liesse station that opened two months after the original opening date in January 2026. The Anse-à-l'Orme Branch (A3) was inaugurated on May 18, 2026 and the YUL-Aéroport-Montréal-Trudeau branch (A2), still has its opening date planned for 2027.

Future growth

Blue Line extension to Anjou

Following the opening of the Blue Line in the 1980s, various governments have proposed extending the line east to Anjou. In 2013, a proposal to extend the line to Anjou was announced by the STM and the Quebec government. On April 9, 2018, premier of Quebec Philippe Couillard and Prime Minister Justin Trudeau announced their commitment to fund and complete the extension, then planned to open in 2026. In March 2022, it was announced that the federal government had agreed to provide $1.3 billion to the extension, with further costs to be covered by the provincial government. The 6-kilometre (3.7 mi) extension will include five new stations, two bus terminals, a pedestrian tunnel connecting to the Pie-IX BRT and a new park-and-ride. Overall, the project is estimated to cost around $5.8 to $6.4 billion and is scheduled to be completed in 2030. Initial construction work began in August 2022.

Pink Line

In 2017, Valérie Plante proposed the Pink Line as part of her campaign for the office of Mayor of Montreal. The new route would have 29 stations and would connect downtown with the northeastern parts of Montreal, as well as the western end of Notre-Dame-de-Grâce and Lachine. The project has since been added to Quebec's 10-year infrastructure plan, and feasibility studies for the line's western section began in June 2021.