Lably
Skip to content

Transport in Croatia

  • 16 min read
  • 6 chapters

Related on Lably

Through Transport, Germany and Switzerland

Rail transport

Railway corridors

The Croatian railway network is classified into three groups: railways of international, regional and local significance. The most important railway lines follow Pan-European corridors V/branch B (Rijeka - Zagreb - Budapest) and X, which connect with each other in Zagreb. With international passenger trains, Croatia is directly connected with two of the neighbouring (Slovenia and Hungary), and many medium-distanced Central European countries such as Czech Republic, Slovakia (during the summer season), Austria, Germany and Switzerland. Dubrovnik and Zadar are two of the most populous and well known cities in Croatia that are not connected with the railway, while the city of Pula (together with the rest of westernmost Istria County) can only be directly reached by railway through Slovenia (unless one takes the railway company's organized bus service between Rijeka and Lupoglav). As most of the country's interior-based larger towns are connected with the railway on which regular passenger train operation is provided (opposite to the coastal part of the country), there are many small inland towns, villages and remote areas that are served by the trains running on regional or local corridors.

Infrastructure condition

In Croatia, railways are served by standard-gauge (1,435 mm; 4 ft 8+1⁄2). Construction length of the railway network is 2617 km; 1626.12 mi. (2341 km / 1454.63 mi. of single-track corridors and 276 km / 171.49 mi. of double-track corridors). 1013 km (629.44 mi.) of railways are electrified, according to the annual rail network public report of Croatian Railways (2023 issue). The largest part of country's railway infrastructure dates back from the pre-World War II period and more than half of the core routes were, in fact, built during the Habsburg monarchy i.e. before World War I. More on that, there were also significant lack of investments and decrease of proper maintenance in Croatian railway infrastructure, roughly from the time of the country's independence (1991) to late 2000s, which mainly resulted in slowing of permitted track speeds, increase of the riding times and decrease in the overall quality of passenger transport, especially since 2010s on Inter City level. As a result, a fair number of routes lag significantly behind West-European standards in the form of infrastructural condition.

However, major infrastructure improvements started to occur in early 2010's and continued through 2020's, such as full-profile reconstruction and/or upgrading of the country's international and most of the regional/local corridors. Those improvements, among other things, results in increasing of both maximum track speed and operation safety, shortening of the travel time and modernization of supporting infrastructure (stations, platforms and other equipment).

First newly built railway in Croatia since 1967 (L214) was opened in December 2019.

The official rail speed record in Croatia is 181 km/h (112 mph). Maximum speed reached in regular service is 160 km/h (99 mph).

Passenger transport

All nationwide and commuter passenger rail services in Croatia are operated by the country's national railway company Croatian Railways.

Sign in to keep reading

5 more chapters are free with a Lably account.

More in Transportation