Artemis program

NASA-led lunar exploration program

  • 31 min read
  • 9 chapters

Related on Lably

Through Moon, President of the United States and Space suit

Among the principal elements of the Artemis program are Space Shuttle–derived hardware, such as the Space Launch System's (SLS) core stage, its RS-25 engines, and solid rocket boosters, as well as systems originating from the canceled Constellation program, including the Orion spacecraft (paired with the European Service Module) and booster upgrades initially developed for Ares V. Other elements, such as the Human Landing System (HLS), are in development by private spaceflight companies under contract. International collaborations are bound by the Artemis Accords.

The uncrewed Artemis I mission sent an Orion spacecraft to lunar orbit in 2022. Artemis II sent four astronauts on a lunar flyby in 2026, becoming the only crewed flight beyond low Earth orbit not part of the Apollo program. Artemis III, scheduled for late 2027, is planned to test an HLS lunar lander in Earth orbit. Artemis IV, targeted for 2028, is planned to be the first crewed lunar landing since Apollo. Beginning with Artemis V, scheduled for no earlier than late 2028, NASA intends yearly lunar landings to develop a permanent lunar base, as a step toward human missions to Mars.

Overview

The Artemis program is organized around a series of missions of increasing complexity, intended to be spaced about a year apart. NASA and its partners have planned missions Artemis I to Artemis V, with additional missions proposed. Each numbered mission centers on launching an SLS rocket carrying an Orion spacecraft. Missions after Artemis II will also rely on support missions by other organizations and spacecraft. Artemis planners have contemplated sending to the moon an archive of cultural works, dubbed Lunar Codex, from creators across the world.

The core infrastructure of Artemis consists of SLS, Orion, and the HLS. Additional program elements include the Commercial Lunar Payload Services, Exploration Ground Systems, Artemis Base Camp, the Lunar Terrain Vehicle, and spacesuit development. Certain program choices, including the use of a near-rectilinear halo orbit and long-term sustainability plans, have drawn criticism.

Orion's first launch on SLS, originally scheduled for 2016, was delayed repeatedly and ultimately flew on November 16, 2022, as Artemis I, carrying mannequins and robotic payloads. The crewed Artemis II (lunar fly-by) mission flew on April 1, 2026. The future Artemis III (Earth orbit) is planned for late 2027, Artemis IV (lunar landing) for early 2028 and Artemis V (lunar landing) for late 2028. NASA plans approximately annual lunar landings thereafter.

SLS missions

  • Artemis I (November 16, 2022) was the first uncrewed test flight of the SLS, Orion, and ESM. The mission sent Orion into a polar distant retrograde lunar orbit for about six days before returning to Earth, where the capsule re-entered the atmosphere and landed in the Pacific Ocean with parachutes. Although the mission was successful overall, Orion's ablative heat shield experienced greater-than-expected erosion during reentry.
  • Artemis II (April 1, 2026) was the first crewed test flight of SLS and Orion. The four crew members performed extensive testing of the spacecraft in high Earth orbit before Orion was boosted into a free-return trajectory around the Moon, returning to Earth for re-entry and splashdown. The mission was broadly comparable to Apollo 7 and Apollo 8, although Artemis II did not orbit the Moon and flew a more distant lunar flyby than the Apollo missions.
  • Artemis III (late 2027) is planned to be the second crewed Artemis mission. The crew will launch aboard SLS/Orion and conduct rendezvous and docking tests in Earth orbit with one or both commercially developed lunar landers launched separately—SpaceX's Starship HLS and Blue Origin's Blue Moon—as well as test the Axiom Extravehicular Mobility Unit (AxEMU) space suit. The mission is broadly comparable to Apollo 9.
  • Artemis IV (early 2028) is planned to be the first American crewed lunar landing since Apollo 17 in December 1972. The mission depends on a prior support flight to place a lander in lunar orbit before the launch of SLS/Orion. After arrival, astronauts will transfer to the lander for descent to the lunar surface, conduct at least two extravehicular activities (EVAs), and then return to lunar orbit for rendezvous with Orion. Orion will subsequently return the four astronauts to Earth. Launch is scheduled for 2028.
  • Artemis V (late 2028) is planned to be the second crewed lunar landing. This mission also is when NASA is expected to begin building its Moon base.