Work on the ship's design began in 1999. The keel was laid in 2009. The carrier was floated out of dry dock in December 2011 and launched in August 2013. Basin trials were completed in December 2020, and sea trials started in August 2021. Its commissioning ceremony was held on 2 September 2022. Aircraft flight trials have been completed in 2023. The total cost of the project is approximately ₹23,000 crore (equivalent to ₹280 billion or US$2.9 billion in 2026) at the time of first sea trials.

It is 262 metres (860 ft) in length, with a top speed of 28 knots (52 km/h; 32 mph) and endurance of 7,500 nautical miles (13,900 km; 8,600 mi). The ship has 2,300 compartments crewed by 1,700 sailors. It has a hospital complex, cabins for female officers, eight kilometres (5.0 mi) of corridors, and four General Electric LM2500 gas turbines.

Background

In 1989, a plan was announced for constructing two aircraft carriers. It was set to decommission in 1997. In 1999, Defence Minister George Fernandes authorised the development and construction of an aircraft carrier, INS Vikrant, under the Project 71 Air Defence Ship (ADS). By that time, given the ageing Sea Harrier fleet, the letter of intent called for a carrier that would carry more modern jet fighters. In 2001, Cochin Shipyard Limited (CSL) released a graphic illustration showing a 32,000-tonne (35,000-short-ton) STOBAR (Short Take-Off, Barrier-Arrested Recovery) design with a pronounced ski jump.

The aircraft carrier project received formal government approval in January 2003. By then, design updates called for a 37,500-tonne (41,300-short-ton) carrier to operate the Mikoyan MiG-29K. India opted for a three-carrier fleet consisting of one carrier battle group stationed on each seaboard, and a third carrier held in reserve, in order to continuously protect both its flanks, to protect economic interests and mercantile traffic, and to provide humanitarian platforms in times of disasters, since a carrier can provide a self-generating supply of fresh water, medical assistance or engineering expertise to populations in need for assistance.

In August 2006, Chief of the Naval Staff Admiral Arun Prakash stated that the designation for the vessel had been changed from Air Defence Ship (ADS) to Indigenous Aircraft Carrier (IAC). The euphemistic ADS had been adopted in planning stages to ward off concerns about a naval build-up. Final revisions to the design increased the displacement of the carrier from 37,500 tons to over 45,000 tons. The length of the ship increased from 252 metres (827 ft) to 262 metres (860 ft).