The U.S. Department of Energy (DOE) began designing an IFR in 1984 and built a prototype, the Experimental Breeder Reactor II. On April 3, 1986, two tests demonstrated the safety of the IFR concept. These tests simulated accidents involving loss of coolant flow. Even with its normal shutdown devices disabled, the reactor shut itself down safely without overheating anywhere in the system. The IFR project was canceled by the US Congress in 1994, three years before completion.

S-PRISM (from SuperPRISM), also called PRISM (power reactor innovative small module), is the name of a nuclear power plant design by GE Vernova Hitachi Nuclear Energy based on the IFR. In 2022, GE Vernova Hitachi Nuclear Energy and TerraPower began exploring locating five Natrium SFR-based nuclear power plants in Kemmerer, Wyoming; the design incorporates a PRISM reactor plus TerraPower's Traveling Wave design with a molten salt storage system.

History

Research on IFR reactors began in 1984 at Argonne National Laboratory in Argonne, Illinois, as a part of the U.S. Department of Energy's national laboratory system, and currently operated on a contract by the University of Chicago.

Argonne previously had a branch campus named "Argonne West" in Idaho Falls, Idaho, that is now part of the Idaho National Laboratory. In the past, at the branch campus, physicists from Argonne West built what was known as the Experimental Breeder Reactor II (EBR-II). In the meantime, physicists at Argonne designed the IFR concept, and it was decided that the EBR-II would be converted to an IFR. Charles Till, a Canadian physicist from Argonne, was the head of the IFR project, and Yoon Chang was the deputy head. Till was positioned in Idaho, while Chang was in Illinois. Chang later served as acting director of Argonne.

The IFR concept is described in detail in Plentiful Energy: The Story of the Integral Fast Reactor.

Cancellation

With the election of President Bill Clinton in 1992, and the appointment of Hazel O'Leary as the Secretary of Energy, there was pressure from the top to cancel the IFR. Senator John Kerry (D-MA) and O'Leary led the opposition to the reactor, arguing that it would be a threat to non-proliferation efforts, and that it was a continuation of the Clinch River Breeder Reactor Project that had been canceled by Congress. Charles Till related that when he told Frank N. von Hippel, a science advisor to President Clinton, that it would cost more to terminate the research program and destroy the reactor than to finish the program and mothball the reactor, von Hippel replied "I know; it's a symbol. It has to go."

Simultaneously, in 1994 Energy Secretary O'Leary awarded the lead IFR scientist with $10,000 and a gold medal, with the citation stating his work to develop IFR technology provided "improved safety, more efficient use of fuel and less radioactive waste".

IFR opponents also presented a report by the DOE's Office of Nuclear Safety regarding a former Argonne employee's allegations that Argonne had retaliated against him for raising concerns about safety, as well as about the quality of research done on the IFR program. The report received international attention, with a notable difference in the coverage it received from major scientific publications. The British journal Nature entitled its article "Report backs whistleblower", and also noted conflicts of interest on the part of a DOE panel that assessed IFR research. In contrast, the article that appeared in Science was entitled "Was Argonne Whistleblower Really Blowing Smoke?".

Since 2000

In 2001, as part of the Generation IV roadmap, the DOE tasked a 242-person team of scientists from DOE, UC Berkeley, Massachusetts Institute of Technology (MIT), Stanford, ANL, Lawrence Livermore National Laboratory, Toshiba, Westinghouse, Duke, EPRI, and other institutions to evaluate 19 of the best reactor designs on 27 different criteria. The IFR ranked #1 in their study which was released April 9, 2002.

At present, there are no integral fast reactors in commercial operation. However, the BN-800 reactor, a very similar fast reactor operated as a burner of plutonium stockpiles, became commercially operational in 2016.