Through Sodium, Radioactive waste and Convection

An SFR uses liquid metallic sodium to carry heat from the reactor core. Sodium's low melting point and high boiling point allow a sodium-cooled reactor to operate at high temperature while remaining at atmospheric pressure. The elimination of pressurized coolant effectively eliminates the risk of a loss-of-coolant accident, while the higher-temperature operation provides better thermal efficiency than light-water reactors. There are two main design approaches to sodium-cooled fast reactors. In pool-type reactors, the intermediate heat exchanger is contained within the reactor vessel, whereas in loop-type reactors, it is located outside the reactor vessel.

As fast-neutron reactors, sodium-cooled fast reactors require nuclear fuel with a higher enrichment to attain criticality than thermal reactors like LWRs. Some SFR designs are breeder reactors, and can produce more fissile plutonium fuel than they consume. However, concerns over the proliferation risk of plutonium fuel are a significant obstacle to the deployment of fast reactors, including SFRs.

The first SFR, and the first nuclear reactor to generate electricity, was the Experimental Breeder Reactor I (EBR-I), which achieved criticality in 1950. Following the success of EBR-I, several additional experimental SFRs were constructed in the United Kingdom, Japan, and France, and a larger prototype in the US. More than 20 SFRs have been operated globally since 1950. Commercial SFRs have been in operation since 1963 with Fermi 1, and several commercial SFRs are under construction as of 2026, including a CFR-600 in China and the Natrium and Aurora reactors in the United States.

History

The concept of a fast-neutron reactor cooled by liquid metal was first demonstrated at Los Alamos with the construction of the Clementine reactor in 1946. The first nuclear reactor to generate electricity was the Experimental Breeder Reactor I (EBR-I), which achieved criticality in 1950. EBR-I was a 0.2 MWe fast reactor cooled by liquid sodium-potassium alloy, and demonstrated the concept of nuclear breeding. It also established sodium as the coolant of choice for fast reactors. However, the reactor experienced a partial meltdown in 1955, which required the core to be removed and replaced.

Following the success of EBR-I, several additional experimental SFRs were constructed. The United Kingdom Atomic Energy Authority built the Dounreay Fast Reactor (DFR), which achieved criticality in 1962, while the US Atomic Energy Commission (AEC) built a larger 20 MWe prototype SFR, the Experimental Breeder Reactor II (EBR-II). EBR-II is considered the most successful US fast reactor, and demonstrated the feasibility of an SFR power plant. The DFR, as well as the French Rapsodie and Japanese Jōyō test reactors all served as prototypes for larger commercial plants.

Commercial SFRs

The first commercial SFR, and first commercial breeder reactor, was the 66 MWe Fermi 1 reactor built in 1963 under the Power Reactor Demonstration Program. This reactor was based on the design of EBR-I, and experienced a similar partial meltdown in 1966. Fermi 1 was shut down for repairs until 1970, after which it operated until 1972.

In the 1960s, the US AEC embarked on a significant program to build commercial liquid metal-cooled fast breeder reactors, eventually being declared the country's highest-priority energy program in 1969. This program culminated in the Clinch River Breeder Reactor Project (CRBRP), which aimed to build a 300 MWe demonstration SFR. The CRBRP experienced significant delays, and became the center of a large political battle of the future of nuclear energy leading to its cancellation in 1983. This decision effectively ended breeder research in the United States.

Following the cancellation of the CRBRP, the US program was refocused on the concept of an Integral Fast Reactor (IFR), an inherently safe SFR that would incorporate on-site fuel reprocessing to close the nuclear fuel cycle. EBR-II was used to investigate the inherent safety characteristics of SFRs as part of the IFR program, and successfully demonstrated safe removal of decay heat via natural circulation in the sodium coolant. However, the IFR program was terminated in 1994 by the Clinton Administration before a demonstration plant could be constructed, and EBR-II was shut down as well.

France constructed the Phénix demonstration SFR in 1973, and the larger commercial Superphénix in 1985. Superphénix was the largest SFR ever constructed, at 1242 MWe. It experienced technical issues and significant political opposition, and was closed in 1998 for political reasons. The closure of Superphénix led to the refocusing of the French nuclear program to light-water reactors instead of fast breeders. Germany constructed the 327 MW SNR-300 fast breeder reactor in 1985, however it suffered significant political backlash and was never taken online. The reactor was officially cancelled in 1991.

Japan invested heavily in sodium-cooled fast breeder reactors beginning in the late 1960s, to reduce its near-total dependence on imported fuels. In the 1960s, it was commonly believed that that uranium supplies would run out relatively quickly, and that breeder reactors were necessary to extend the fuel supply. However, the global supply of uranium never became endangered. Unlike other countries, the Japanese breeder program was noted as having persisted despite the predicted uranium shortage never materializing. Jōyō, an experimental SFR, was constructed starting in 1970 and started operating in 1977.

Following the success of Jōyō, a larger demonstrator, the 280 MWe Monju Nuclear Power Plant, was built between 1986 and 1994. In 1995, while at 43% power for a system start-up test, a broken temperature sensor caused a leak of sodium from the secondary cooling loop. Monju's operator, the government-run Power Reactor and Nuclear Fuel Development Corporation (PNC), took more than 90 minutes to shut down the reactor. The operators failed to stop the reactor immediately and drain the secondary sodium loop, causing over 640 kg of sodium to leak and catch fire. The fire caused no injuries, but caused damage to the cooling system that required several years of repairs. Following the fire, PNC attempted to cover up the incident by tampering with videotapes of the incident response, and fabricated accident information. The exposure of the coverup a few weeks later caused national outrage. Several experts have described the political damage as far more severe than the physical damage. The fire, and especially the subsequent coverup, heavily damaged the Japanese public's confidence in both the breeder program and in nuclear energy.

Monju was shut down until 2010, both due to repairs and a lawsuit aiming to block the restart. Following restart, and just after refueling, the reactor's fuel handling machine fell into the reactor vessel, and could not be retrieved until the following year. The damaged machine was replaced, however the Nuclear Regulation Authority did not permit the reactor to restart, ruling in 2015 that PNC was too incompetent to operate the plant. Monju was closed permanently in 2016. This decision marked the effective end of the breeder program.

The Soviet Union constructed multiple commercial SFRs at the Beloyarsk Nuclear Power Station, starting with the BN-350 reactor. The BN-350 operated between 1972 and 1999 and produced both electricity and process heat for desalination. Two additional SFRs, BN-600 and BN-800, came online in 1980 and 2014, and are considered commercially successful. As of 2024, the BN-800 reactor has a capacity factor above 80% and has successfully demonstrated the burning of surplus plutonium.

Strong interest in the breeder cycle was driven primarily by an expected shortage of uranium resources. However, this shortage never materialized and the light-water reactor eventually dominated the market while the construction of SFRs stalled. An exception is India, which lacks significant uranium resources and has pursued breeder reactors as part of India's three-stage nuclear power programme. The second stage of this plan calls for the construction of commercial SFR plants that can breed fissile plutonium and uranium-233 for use in heavy-water reactors. The experimental Fast Breeder Test Reactor, based on the French Rapsodie design, was constructed starting in 1972 and has remained operational since 1985. A demonstration-scale reactor, the 500 MWe Prototype Fast Breeder Reactor, started construction in 2004 and was completed in 2024 following significant delays. The reactor reached criticality in April 2026.

Concerns over nuclear weapons proliferation, particularly over the use of plutonium fuel, increased significantly in the 1970s following India's 1974 nuclear test. In the United States, proliferation considerations surrounding plutonium abounded during the Carter Administration, leading to the abandonment of US reprocessing in 1977. This position was further strengthened in the 1990s by the Clinton Administration, which shut down the Fast Flux Test Facility and largely abandoned fast reactor development.

Later SFR designs emphasized modular construction and passive safety features. The US Department of Energy ran an Advanced Liquid-Metal Reactor (ALMR) program in the 1980s and 1990s, resulting in the General Electric-designed PRISM reactor, a small modular SFR. PRISM introduced the use of factory-fabrication and multi-module plants to reduce the cost of building new reactors.

Generation IV SFRs

Following the ALMR, the Department of Energy founded the Generation IV International Forum (GIF) to commercialize advanced nuclear technologies. The GIF selected six reactor concepts for further development, including the Sodium-cooled Fast Reactor. The GIF specifically emphasized the waste-management and resource utilization abilities of the SFR as desirable.

China National Nuclear Corporation (CNNC) started building the first CFR-600 breeder reactor in 2017 at Xiapu, which finished in 2023. A second unit started construction in 2020.

US company TerraPower developed a type of travelling-wave SFR and planned to build a 600 MWe demonstration unit with China National Nuclear Corporation in 2015. However, the project was cancelled in 2019 and the company shifted to developing a conventional pool-type SFR, Natrium, combining their travelling-wave reactor with the GE-Hitachi PRISM design. The reactor incorporates a molten-salt thermal energy storage system that allows it to vary its power output between 500 MWe and 100 MWe, while remaining at a constant 840 MWth thermal power output.

In 2020, TerraPower received an $80M grant from the US Department of Energy (DOE) for development of the Natrium SFR under the Advanced Reactor Demonstration Program. The Department of Energy later awarded $2 billion for the project by 2022. The company selected Kemmerer, Wyoming as the site for its first deployment in 2021, as Kemmerer Power Station Unit 1. TerraPower submitted a construction permit application to the Nuclear Regulatory Commission in 2024, and non-nuclear construction later that year. The NRC issued the construction permit for Kemmerer Unit 1 on March 4, 2026, and nuclear construction began on April 23.

In 2023, ARC Clean Technology Canada signed a memorandum of understanding with the Government of Alberta to support the deployment of the company's 100 MWe ARC-100 modular SFR. The ARC-100 reactor completed a pre-licensing review with the Canadian Nuclear Safety Commission in 2025, and the company plans to construct its first unit at the Point Lepreau Nuclear Generating Station by 2029, in partnership with New Brunswick Power.

Oklo Inc. designed a 75 MWe pool-type SFR, the Aurora Powerhouse. The first unit, Aurora-INL, broke ground at Idaho National Laboratory in 2025 under DOE authorization. The company also plans to build a private fuel recycling facility in Tennessee, that will use electrochemical refining and pyroprocessing to recycle spent nuclear fuel.