Lably
Skip to content

North American Water and Power Alliance

Proposed interlinking of Canadian and American rivers

  • 5 min read
  • 3 chapters

Related on Lably

Through Canada, Interstate Highway System and Hydroelectricity

The plan

A technical and economic blueprint for the plan was developed in 1964 by the Parsons Corporation of Pasadena, California. The total cost was estimated in 1975 as $100 billion, comparable in cost to the Interstate Highway System.

Water management

The Parsons plan would divert water from the Yukon, Liard and Peace River systems into the southern half of the Rocky Mountain Trench which would be dammed into a massive, 500 mi (805 km)-long reservoir. Some of the water would be sent east across central Canada to form a navigable waterway connecting Alberta to the Great Lakes with the additional benefit of stabilizing the Great Lakes' water level. The rest of the water would enter the United States in northern Montana, providing additional flow to the Columbia and Missouri–Mississippi river systems, and would be pumped over the Rocky Mountains via the Sawtooth Lifts in Idaho. From there, it would run south via aqueducts to the Colorado River and Rio Grande systems. Some of this water would be sent around the southern end of the Rockies in New Mexico and pumped north to the High Plains, stabilizing the Ogallala Aquifer. The increased flow of the Colorado River, meanwhile, would enter Mexico, allowing for greater development of agriculture in Baja California and Sonora.

The project would provide 75 million acre-feet (93 km3) of water to water-deficient areas in the North American continent, including Canada and the United States, as well as irrigation water for Mexico, which Parsons claimed would receive enough water to reclaim 7 or 8 times more land than Egypt reclaimed with the Aswan High Dam. It would provide increased water flow in the upper Missouri and Mississippi rivers during periods of low flow, increased hydropower generation along the Columbia River, and stabilize water levels in the Great Lakes. Parsons originally proposed using peaceful nuclear explosions to excavate trenches and underground water storage reservoirs for the system.

Power generation

The project would generate a vast amount of electricity from a number of hydroelectric and nuclear power facilities (the latter of which would be required to power the multiple pumping stations needed to move the water across the continent). The issue of electricity generation created some controversy, with some commentators such as Marc Reisner arguing that the plan would be a net consumer of energy, while others estimated a net gain of 60 to 80 million kilowatts after meeting the needs for pumping.

Transportation

The plan would potentially have included a navigable waterway in Canada from Alberta to Lake Superior, to be called the Transcontinental Canal. In addition to increasing availability of water, the canal would address problems of water pollution.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Engineering