Lably
Skip to content

Transportation forecasting

Estimation of future use of some transport infrastructure

  • 6 min read
  • 6 chapters

Related on Lably

Through Vehicle, Transport and Road

Traffic forecasts are used for several key purposes in transportation policy, planning, and engineering: to calculate the capacity of infrastructure, e.g., how many lanes a bridge should have; to estimate the financial and social viability of projects, e.g., using cost–benefit analysis and social impact assessment; and to calculate environmental impacts, e.g., air pollution and noise.

Four-step models

Within the rational planning framework, transportation forecasts have traditionally followed the sequential four-step model or urban transportation planning (UTP) procedure, first implemented on mainframe computers in the 1950s at the Detroit Metropolitan Area Traffic Study and Chicago Area Transportation Study (CATS).

Land-use forecasting starts the process. Typically, forecasts are made for the region as a whole, e.g., of population growth. Such forecasts provide control totals for the local land use analysis. Typically, the region is divided into zones and by trend or regression analysis, the population and employment are determined for each.

The four steps of the classical urban transportation planning system model are:

  • Trip generation determines the frequency of origins or destinations of trips in each zone by trip purpose, as a function of land uses and household demographics, and other socio-economic factors.
  • Trip distribution matches origins with destinations, often using a gravity model function, equivalent to an entropy maximizing model. Older models include the Fratar or Furness method, a type of iterative proportional fitting.
  • Mode choice computes the proportion of trips between each origin and destination that use a particular transportation mode (this modal model may be of the logit form).
  • Route assignment allocates trips between an origin and destination by a particular mode to a route. Often (for highway route assignment) Wardrop's principle of user equilibrium is applied (equivalent to a Nash equilibrium), wherein each driver (or group) chooses the shortest (travel time) path, subject to every other driver doing the same. The difficulty is that travel times are a function of demand, while demand is a function of travel time, the so-called bi-level problem. Another approach is to use the Stackelberg competition model, where users ("followers") respond to the actions of a "leader", in this case for example a traffic manager. This leader anticipates on the response of the followers.

After the classical model, there is an evaluation according to an agreed set of decision criteria and parameters. A typical criterion is cost–benefit analysis. Such analysis might be applied after the network assignment model identifies needed capacity: is such capacity worthwhile? In addition to identifying the forecasting and decision steps as additional steps in the process, forecasting and decision-making permeate each step in the UTP process. Planning deals with the future, and it is forecasting dependent.

Sign in to keep reading

5 more chapters are free with a Lably account.

More in Transportation