Constructed between 1935 and 1939, Abberton Reservoir is owned and managed by Essex and Suffolk Water, part of Northumbrian Water Group, and lies 6 km (3.7 mi) south-west of Colchester near the village of Layer de la Haye. In World War II, the reservoir was mined to deter invading seaplanes, and it was used by the RAF's No. 617 Squadron ("The Dam Busters") for practice runs for the bombing of the German dams in the Ruhr. A project to increase the capacity of Abberton Reservoir to 41,000 megalitres (9.0×109 imp gal) by raising its bank height was completed in 2013, along with a new link to transfer water from Norfolk's River Ouse to the Stour.

The reservoir is important for its breeding cormorants, wintering and moulting waterfowl, and migrating birds. It is an internationally important wetland, designated as a Ramsar site, Site of Special Scientific Interest and Special Protection Area, and is listed in A Nature Conservation Review. A small part of the site is managed by the Essex Wildlife Trust.

History

Essex is one of the driest counties in the UK, situated as it is the East of England region, the driest part of Britain. The first major project to address local water needs was the establishment of the South Essex Waterworks Company in 1861, which extracted water from the underlying chalk aquifer through wells and boreholes. This supplied an area north east of London from East Ham to Grays and Brentwood. Despite the tapping of new wells, by the outbreak of World War I, the demand was outstripping supply, and eventually the need to find new sources led to the creation of a new reservoir.

The South Essex Waterworks Act 1928 (18 & 19 Geo. 5. c. lxxix) gave the water company the authority to plan and oversee the construction of a new reservoir to supply the local area, and further legislation in 1935 approved the necessary infrastructure in terms of pipelines to the Stour, pumping stations and a water treatment plant. The reservoir was constructed between 1935 and 1939 on a site that was formerly farmland with a couple of small woods, by damming the Layer Brook, although most of its water is pumped in from the River Stour 14 km (8.7 mi) to the north east of the reservoir.

The 690 m (2,270 ft) dam wall was constructed using the underlying London Clay to build an impermeable puddle clay core. Layers of soil and gravel were piled on both sides of the clay core to increase the dam's strength. Existing buildings and plant life were cleared from within the reservoir basin boundaries, and the topsoil stripped and used to profile the reservoir's edges. A concrete apron and road covered 13.7 kilometres (8.5 mi) of the 17.7-kilometre (11.0 mi) perimeter. Two existing roads were kept, crossing the west end of the reservoir on causeways completed in May 1939. The reservoir originally held 25,000 megalitres (5.5×109 imp gal) of water.

World War II

Abberton Reservoir was first filled just before the start of World War II in 1939, and the Ministry of Defence was concerned that it might be used by German seaplanes as part of a possible invasion. To prevent this, 312 naval mines, anchored by steel cables, were laid in a grid across the reservoir. Steel cables were stretched across the part of the reservoir nearest to the pumping station, since exploding mines might have damaged the building. Some were inadvertently detonated by ice, but most were exploded after the war by soldiers firing from the banks.

A German Heinkel bomber returning from a raid on Hornchurch airfield was shot down over Abberton on 24 August 1940. One of its crew bailed out from the burning plane and was captured; another drowned.

The reservoir was used by the RAF's No. 617 Squadron ("The Dam Busters") for practice runs for attacks against German dams in the Ruhr during World War II (Operation Chastise). The reservoir was intended to simulate the Edersee Dam in Germany. Lancaster bombers fitted with special bouncing bombs designed by Barnes Wallis were used in these trials, and military police closed the causeway whilst the practice runs took place. The last practice flight to Abberton was a full dress rehearsal of the Ruhr attack, and took place on the night of 14 May 1943. The actual attack on the dams in Germany took place two nights later on 16 May 1943. The Edersee Dam was attacked and breached after the Möhne dam had been successfully destroyed.

In 2025, a blue plaque was installed at the reservoir commemorating Abberton Reservoir's involvement in the Dam Busters' preparations.

Expansion

The reservoir's current owners, Essex and Suffolk Water, part of the Northumbrian Water Group, recognised by 2007 that its capacity was insufficient to meet growing local demand, and initiated a £140 million project to increase the capacity to 41,000 megalitres (9.0×109 imp gal) by raising its banks. The scheme was completed in 2013, and included replacing the existing link from the Stour to Abberton with new, higher capacity, pipes following a different route and extracting water at Wormingford instead of Stratford St. Mary.

The other major part of the project was to enable the transfer of water from the Ouse, 141 km (88 mi) distant in Norfolk, to the reservoir via the Stour. Existing pipelines and associated infrastructure such as pumping stations carried water from the Ouse at Denver to Kirtling Green. From there, a new 15.5-kilometre (9.6 mi) tunnel was constructed to Wixoe, where existing pipelines completed the transfer to the Stour.

The reservoir has a current maximum area of 535 ha (1,320 acres), and has three sections separated by the Layer Breton and Layer de la Haye causeways. The easternmost large, deep Main section, originally 410 hectares (1,000 acres) was enlarged to its current 535 ha (1,320 acres) in 2013, the Central section covers 49 ha (120 acres), and the Western section is 16 ha (40 acres). The current maximum water depth is about 17 m (56 ft), 3.2 m (10 ft) more than before the enlargement.

In wet years, Abberton and the other major Essex reservoir at Hanningfield can meet the requirements of the 750,000 people they serve in Essex and north east London using only water from the Stour and other local sources, but in average years 7% of the inflow involves transfers from the Ouse, rising to 35% in times of drought.